Contractor · Plumbing
BLUBAUGH PLUMBING LLC
241 building permits since 2021 in Howard County, MD and Arlington County, VA, across 2 counties.
- Building permits
- 241
- Reported job value
- —
- Active
- 2021–2025
- Latest permit
- Apr 28, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD239
- Arlington County, VA2
Permits by year
By issue date (application date where there is none).
075150
145
20212022202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 145 |
| 2022 | 93 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing241
- Gas237
- Bathrooms236
- HVAC235
- Kitchens235
- Water heaters235
- New construction98
- Remodels4
- Additions4
Permit types
As the building departments classify them.
- Residential New Plumbing Permit234
- Residential Plumbing Addition Alteration Permit4
- Plumbing2
- Express Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 28, 2025 | Residential Plumbing Addition Alteration Permit | SFD//FIXTURES IN TWO BATHROOMS (ONE CURBLESS SHOWER, ONE TUB SHOWER, TWO TOILETS AND TWO VANITIES) | Howard County | — |
| Jan 8, 2024 | Residential Plumbing Addition Alteration Permit | SFD//TIE IN NEW SUPPLY LINE/TAP FROM OTHERS TO EX HOUSE WITH BACKFLOW PREVENTER (Wilkins 700XLFP)/**7.1.24 AMENDMENT REQUEST TO CHANGE THE MODEL OF THE BACKFLOW | Howard County | — |
| Nov 15, 2023 | Residential Plumbing Addition Alteration Permit | SFD//Install plumbing fixtures in new bathroom per building permit B23003722; fixtures include 1-toilet, 1-shower, 1-lavatory, 1-sewage pump, and 1-hose bib. BA | Howard County | — |
| Oct 28, 2022 | Express Plumbing Permit | Repair drain line under basement slab. | Howard County | — |
| Oct 5, 2022 | Plumbing | Install plumbing and gas in a new SFD home | Arlington County | — |
| Oct 5, 2022 | Plumbing | Install plumbing and gas in a new SFD home | Arlington County | — |
| Sep 23, 2022 | Residential New Plumbing Permit | NEW SFD/ 'STATFORD HALL'/ INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// 4 - BATHTUB/ 3- SHOWER/ 8 - LAV/ 6 - WATER CLOSET/ 1- KITCHEN SINK /1 - | Howard County | — |
| Sep 23, 2022 | Residential New Plumbing Permit | NEW/ SFD/ ‘TYLER’/ INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// 3 - BATHTUB/ 2 - SHOWER/ 7 - LAV/ 5 - WATER CLOSET/ 1 - KITCHEN SINK /1 - DISHW | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed238
- Finaled2
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.