Contractor · Plumbing

BLUBAUGH PLUMBING LLC

241 building permits since 2021 in Howard County, MD and Arlington County, VA, across 2 counties.

Building permits
241
Reported job value
—
Active
2021–2025
Latest permit
Apr 28, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD239
  • Arlington County, VA2

Permits by year

By issue date (application date where there is none).

075150
145
20212022202320242025
View as table
YearPermits
2021145
202293
20231
20241
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing241
  • Gas237
  • Bathrooms236
  • HVAC235
  • Kitchens235
  • Water heaters235
  • New construction98
  • Remodels4
  • Additions4

Permit types

As the building departments classify them.

  • Residential New Plumbing Permit234
  • Residential Plumbing Addition Alteration Permit4
  • Plumbing2
  • Express Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 28, 2025Residential Plumbing Addition Alteration PermitSFD//FIXTURES IN TWO BATHROOMS (ONE CURBLESS SHOWER, ONE TUB SHOWER, TWO TOILETS AND TWO VANITIES)Howard County—
Jan 8, 2024Residential Plumbing Addition Alteration PermitSFD//TIE IN NEW SUPPLY LINE/TAP FROM OTHERS TO EX HOUSE WITH BACKFLOW PREVENTER (Wilkins 700XLFP)/**7.1.24 AMENDMENT REQUEST TO CHANGE THE MODEL OF THE BACKFLOWHoward County—
Nov 15, 2023Residential Plumbing Addition Alteration PermitSFD//Install plumbing fixtures in new bathroom per building permit B23003722; fixtures include 1-toilet, 1-shower, 1-lavatory, 1-sewage pump, and 1-hose bib. BAHoward County—
Oct 28, 2022Express Plumbing PermitRepair drain line under basement slab.Howard County—
Oct 5, 2022PlumbingInstall plumbing and gas in a new SFD homeArlington County—
Oct 5, 2022PlumbingInstall plumbing and gas in a new SFD homeArlington County—
Sep 23, 2022Residential New Plumbing PermitNEW SFD/ 'STATFORD HALL'/ INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// 4 - BATHTUB/ 3- SHOWER/ 8 - LAV/ 6 - WATER CLOSET/ 1- KITCHEN SINK /1 - Howard County—
Sep 23, 2022Residential New Plumbing PermitNEW/ SFD/ ‘TYLER’/ INSTALL WATER AND SEWER/ INSTALL GAS AND PLUMBING FIXTURES:// 3 - BATHTUB/ 2 - SHOWER/ 7 - LAV/ 5 - WATER CLOSET/ 1 - KITCHEN SINK /1 - DISHWHoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed238
  • Finaled2
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.