Contractor · Demolition & excavation

LLOYD ENTERPRISES INC

17 building permits since 2017 in Tacoma city, WA and Puyallup city, WA — $208,520 in reported job value over 15 permits that state one.

Building permits
17
Reported job value
$208.5K
Active
2017–2026
Latest permit
May 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA16
  • Puyallup city, WA1

Permits by year

By issue date (application date where there is none).

036
6
2017202120232026*
* 2026 is year to date.
View as table
YearPermits
20176
20181
20212
20222
20232
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing4
  • Demolition4
  • Fire sprinklers2
  • Roofing1

Permit types

As the building departments classify them.

  • Building10
  • Utility Connection6
  • Civil Construction Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 21, 2026Civil Construction Permit27th Townhomes Civil PlansPuyallup City—
Jun 24, 2025Utility ConnectionReplacement of stormwater pipe - connect to existing roof drain line and go through concrete curb,Tacoma City$310
Jun 5, 2025BuildingInstall 6" DI Fire Service Line from Tacoma Water installed vault to Ted Brown building. Also install 6" post indicator valve.Tacoma City$9,560
Jun 5, 2025Utility ConnectionConnect to water meter installed by Tacoma Water and run a 1.5" service line from the meter to the existing Ted Brown building.Tacoma City$1,376
Apr 10, 2023Utility ConnectionConnect to 3 ea TPU installed 3 water meters associated with SDEV20-0463. Includes 395 LF 4 DI Cl 42 dometic service piping to new Independent Living Bldg and eTacoma City$21,266
Mar 29, 2023Utility ConnectionInstall 97 LF of 4 DI CL 52 domestice water service line to connect from water meter to HH building.Tacoma City$7,285
May 5, 2022BuildingInstall 4 fire line, PIV, and floor flange from Tacoma Water meter to new Tacoma Lutheran HH building. Also install 6 FDC line, floor flange, and FDC for same bTacoma City$24,826
Apr 15, 2022BuildingIntallation of underground fire supply line and post indicator valve for new Independent Living building at Tacoma Lutheran Retirement Community.Tacoma City$23,080

Permit status

Where its permits stand, as the departments report them.

  • Finaled9
  • Void2
  • Issued2
  • Closed1
  • Expired1
  • Cancelled1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.