Contractor · Demolition & excavation
LASTER CONSTRUCTION, LLC
17 building permits since 2022 in Cleveland city, OH — $483,128 in reported job value over 17 permits that state one.
- Building permits
- 17
- Reported job value
- $483.1K
- Active
- 2022–2026
- Latest permit
- Jun 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cleveland city, OH17
Permits by year
By issue date (application date where there is none).
048
7
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 7 |
| 2024 | 5 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation10
- Demolition10
- Remodels7
- HVAC3
- Roofing3
- Electrical3
- Plumbing1
- Windows & doors1
Permit types
As the building departments classify them.
- Demolition10
- Alteration5
- Change Use1
- Correct Violation1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 24, 2026 | Change Use | SITE / EXTERIOR ALTERATION 5,000 SQ FT AFFINITY ALARM BUILDING PER APPROVED PLANS. RE-SURFACE PARKING LOT, INSTALL NEW DRIVEWAY APRON, SECURITY SHUTTERS. PROVID | Cleveland City | $42,940 |
| Sep 24, 2025 | Demolition | RAZE 2 STORY FRAME 2 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP | Cleveland City | $17,000 |
| Aug 1, 2025 | Demolition | RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP | Cleveland City | $10,000 |
| Apr 25, 2025 | Demolition | RAZE 2.5 STORY FRAME 2 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP | Cleveland City | $11,000 |
| Jun 24, 2024 | Demolition | RAZE 1 STORY FRAME 1 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UT | Cleveland City | $15,000 |
| May 29, 2024 | Demolition | RAZE 2 STORY FRAME 2 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTI | Cleveland City | $9,888 |
| Mar 6, 2024 | Alteration | INTERIOR & EXTERIOR ALTERATIONS REMOVE AND REBUILD ALL AFFECTED AREAS OF EXISTING TWO FAMILY RESIENCE PER PLAN. SEPERATE: ELEC, PLUM, HVAC PERMIT REQUIRED. HAUL | Cleveland City | $40,000 |
| Jan 16, 2024 | Demolition | RAZE 1.5 STORY FRAME 1 DU & SHED. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINU | Cleveland City | $12,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed9
- Pending6
- Approved1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.