Contractor · Electrical

GRACE ELECTRICAL AND FARMS

17 building permits since 2025 in Richlands township, NC; Onslow County, NC and Richlands town, NC — $556,278 in reported job value over 6 permits that state one.

Building permits
17
Reported job value
$556.3K
Active
2025–2026
Latest permit
Sep 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Richlands township, NC11
  • Onslow County, NC2
  • Richlands town, NC2
  • Stump Sound township, NC1
  • Jacksonville city, NC1

Permits by year

By issue date (application date where there is none).

07.515
13
20252026*
* 2026 is year to date.
View as table
YearPermits
20254
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Electric meters4
  • HVAC3
  • New construction2
  • Plumbing1
  • Generators1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Residential Electrical - Change Out3
  • Commercial Electrical - Commercial New2
  • Residential Mechanical - Change Out2
  • Commercial Building - Commercial Modular1
  • Commercial Electrical - Commercial Utility Reconnect1
  • ELECTRICAL-HOOKUP/REPAIRS1
  • Residential Accessory - Detached Garage1
  • Residential Building - Modular Home1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 1, 2026Commercial Electrical - Commercial Utility ReconnectRECONNECT ELECTRICAL SERVICE TO BUILDINGOnslow County—
Sep 1, 2026Residential Electrical - Change OutTERMINATING GENERATOR, INSTALLATION OF NEW METER BASE AND TRANSFER SWITCHRichlands town—
Aug 28, 2026Residential Building - Modular HomeSet-up new modular home w/ plumbing and electrical trades. HO is doing the HVAC. This modular will have a front suspended concrete covered porch 8 x 16 with steRichlands township$150,000
Aug 28, 2026Residential Mechanical - Change OutCHANGE OUT HEAT PUMP AND AIR HANDLERRichlands township—
Aug 7, 2026Residential Electrical - Change OutNEW 200A METER BASE, OLD ONE DAMAGED DUE TO TREERichlands township—
Aug 3, 2026Commercial Electrical - Commercial New3 STAND ALONE PEDISTALS TO FEED POWER TO 1.) OUR SIGN. 2.) OUR DISPLAY HOME. 3.) POWER PEDISTAL AT WAREHOUSE.Richlands township—
Aug 3, 2026Residential Electrical - Residential Single RV (RA Zone)SET UP RVRichlands township—
Jul 20, 2026Commercial Building - Commercial ModularNEW MODULAR - SALES OFFICE AND LOT MODELSRichlands township$250,000

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Issued4
  • Approved2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.