Contractor · Electrical
George Marenna
17 building permits since 2015 in Bristol town, CT; Enfield town, CT and Stratford town, CT, across 5 counties — $8,525 in reported job value over 17 permits that state one.
- Building permits
- 17
- Reported job value
- $8.5K
- Active
- 2015–2026
- Latest permit
- Oct 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bristol town, CT6
- Enfield town, CT4
- Stratford town, CT3
- New Milford town, CT3
- Lebanon town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 4 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical17
- Generators16
Permit types
As the building departments classify them.
- Electrical Permit17
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 26, 2026 | Electrical Permit | 2 kiddie rides and 125kw dual grounded generator, 5 wire system. Both rides plug in with twist locs. Any wire in walking areas matted. State FM will inspect fri | New Milford Town | $500 |
| Sep 21, 2026 | Electrical Permit | Amusement Rides , Mum Festival. 300 kw dual grounded generator. Five wires eletrical system. All rides plug in with twist locs. All wires matted in walking area | Bristol Town | $500 |
| Jul 21, 2026 | Electrical Permit | Amusement Rides and Generator for fair. 5 wire eletrical system. All wires matted in walking areas,State FM will inspect friday july 24th at 10am, local eletric | Lebanon Town | $500 |
| Jun 10, 2026 | Electrical Permit | One amusement ride and generator, plug in with L30 twist loc plug. 5 wire eletrical system, dual grounded generator, all wires matted in walking areas . State F | New Milford Town | $500 |
| Jun 3, 2026 | Electrical Permit | 2 amusement rides for Stratford day. 1 125kw dual grounded generator, 5 wire system. All wires matted in walking areas. Both rides plug in with L-30 twist loc p | Stratford Town | $500 |
| Jun 2, 2026 | Electrical Permit | Amusement rides for church carnival, 300 kw dual grounded generator, 5 wire system. All wires matted in walking areas. State fire marshal will be there friday J | Stratford Town | $500 |
| May 28, 2026 | Electrical Permit | Amusement Rides and Generator for church carnival, 5 wire eletrical system with dual grounded 150kw generator. All wires matted in walking areas. State will be | Enfield Town | $500 |
| Oct 17, 2025 | Electrical Permit | Amusement Rides for church event 10/25. powered by 300 kw dual grounded generator . 5 wire eletrical system. All wires matter in walking areas. State FM is sche | New Milford Town | $500 |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.