Contractor · Electrical

FAITH ENTERPRISES INCORPORATED

17 building permits since 2011 in Boulder city, CO and Brighton city, CO, across 2 counties — $503,490 in reported job value over 17 permits that state one.

Building permits
17
Reported job value
$503.5K
Active
2011–2026
Latest permit
Aug 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO16
  • Brighton city, CO1

Permits by year

By issue date (application date where there is none).

036
6
20112013201620182026*
* 2026 is year to date.
View as table
YearPermits
20111
20121
20132
20152
20166
20172
20181
20201
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • EV chargers11
  • Demolition2
  • HVAC1
  • Grading & excavation1
  • Remodels1

Permit types

As the building departments classify them.

  • Electrical Permit15
  • Restoration/Alteration1
  • Sign Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 25, 2026Restoration/Alterationinterior Lighting Fixture replacementBrighton City$441,627
Dec 1, 2020Electrical Permit*Furnish and install (2) 2 pole 40-amp breakers.? Use existing raceway from the electrical panel to the outside wall there it connects to a disconnect for the HBoulder$5,069
Jun 21, 2018Electrical PermitInstallation of 2 EV car charging stations. One, free standing charge will be installed on the northwest corner of the building on the north wall serving the alBoulder$3,500
Dec 14, 2017Electrical PermitElectrical permit for replacement of two (2) electrical vehicle (EV) charging stations in same location as previously approved through PMT2011-03371 at South BoBoulder$1,360
Dec 14, 2017Electrical Permit*Voided for inactivity due to no inspections performed within 180 days of issuance.*Electrical permit to replace a free-standing electric vehicle (EV) charging Boulder$1,360
Dec 15, 2016Electrical PermitInstallation of four dual port EV charging station at Broadway and Alpine parking garage. Stations protected by bollards and placed on associated footings.Boulder$4,300
Dec 15, 2016Electrical PermitInstallation of two dual port EV charging station at Boulder Junction parking garage. Stations protected by bollards and placed on associated footings.Boulder$2,500
Dec 15, 2016Electrical Permit*Voided for inactivity due to no inspections performed within 180 days of issuance*Installation of an dual port EV charging station at parking area on southwestBoulder$3,800

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Void3
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.