Contractor · Electrical
Engineering
17 building permits since 2022 in Los Angeles city, CA; Merced city, CA and Elk Grove city, CA, across 3 counties — $35,785 in reported job value over 3 permits that state one.
- Building permits
- 17
- Reported job value
- $35.8K
- Active
- 2022–2026
- Latest permit
- May 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA10
- Merced city, CA5
- Elk Grove city, CA1
- Whittier city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 6 |
| 2023 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Solar3
- Telecom2
- Accessory dwelling units1
- Battery storage1
- Grading & excavation1
- Generators1
- Windows & doors1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Electrical9
- Groundbreaking2
- Non-Groundbreaking2
- Engineering1
- Grading1
- Nonbldg-New1
- ONLINE WINDOWS OR DOORS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 29, 2026 | Non-Groundbreaking | Attachment of fiber optic cable to existing utility poles & Placement of temp poles. Section 13 - 16 Aerial Stamped as approved. | Merced City | — |
| May 13, 2026 | Groundbreaking | Attachment of fiber optic cable to existing utility poles & placement of temporary poles. *SECTION 9-12 AERIAL* | Merced City | — |
| May 12, 2026 | ONLINE WINDOWS OR DOORS | Replace 23 windows and 1 sliding glass door. | Elk Grove City | $23,650 |
| Mar 13, 2026 | Electrical | 500sf patio cover attached at rear of (e) residence per engineered plan. Installing (12) fixtures, (3) outlets, & (1) dimmer switch. | Whittier City | — |
| Dec 22, 2025 | Groundbreaking | Race Communications underground install at G St undercrossing. | Merced City | — |
| Oct 21, 2025 | Non-Groundbreaking | Section 5-8 Aerial Plans for Race Communications. Section 5 - Approved, Section 6 - Approved, Section 7 - Not Received, Section 8 - Not Received, | Merced City | — |
| May 30, 2025 | Engineering | Replace emergency generator for City Hall | Merced City | — |
| May 16, 2023 | Electrical | — | Los Angeles City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated8
- Issued6
- Finaled2
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.