Contractor · Electrical

Engineering

17 building permits since 2022 in Los Angeles city, CA; Merced city, CA and Elk Grove city, CA, across 3 counties — $35,785 in reported job value over 3 permits that state one.

Building permits
17
Reported job value
$35.8K
Active
2022–2026
Latest permit
May 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA10
  • Merced city, CA5
  • Elk Grove city, CA1
  • Whittier city, CA1

Permits by year

By issue date (application date where there is none).

036
6
2022202320252026*
* 2026 is year to date.
View as table
YearPermits
20226
20234
20253
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Solar3
  • Telecom2
  • Accessory dwelling units1
  • Battery storage1
  • Grading & excavation1
  • Generators1
  • Windows & doors1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Electrical9
  • Groundbreaking2
  • Non-Groundbreaking2
  • Engineering1
  • Grading1
  • Nonbldg-New1
  • ONLINE WINDOWS OR DOORS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 29, 2026Non-GroundbreakingAttachment of fiber optic cable to existing utility poles & Placement of temp poles. Section 13 - 16 Aerial Stamped as approved.Merced City—
May 13, 2026GroundbreakingAttachment of fiber optic cable to existing utility poles & placement of temporary poles. *SECTION 9-12 AERIAL*Merced City—
May 12, 2026ONLINE WINDOWS OR DOORSReplace 23 windows and 1 sliding glass door.Elk Grove City$23,650
Mar 13, 2026Electrical500sf patio cover attached at rear of (e) residence per engineered plan. Installing (12) fixtures, (3) outlets, & (1) dimmer switch.Whittier City—
Dec 22, 2025GroundbreakingRace Communications underground install at G St undercrossing.Merced City—
Oct 21, 2025Non-GroundbreakingSection 5-8 Aerial Plans for Race Communications. Section 5 - Approved, Section 6 - Approved, Section 7 - Not Received, Section 8 - Not Received,Merced City—
May 30, 2025EngineeringReplace emergency generator for City HallMerced City—
May 16, 2023Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated8
  • Issued6
  • Finaled2
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.