Contractor · Electrical

XERO SOLAR

245 building permits since 2014 in Los Angeles city, CA; Marin County, CA and Hermosa Beach city, CA, across 4 counties — $947,768 in reported job value over 18 permits that state one.

Building permits
245
Reported job value
$947.8K
Active
2014–2026
Latest permit
Mar 4, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA224
  • Marin County, CA5
  • Hermosa Beach city, CA4
  • San Diego County, CA3
  • Anaheim city, CA2
  • Burbank city, CA2
  • Culver City city, CA2
  • El Segundo city, CA2
  • Norwalk city, CA1

Permits by year

By issue date (application date where there is none).

03060
57
201520172019202120232026*
* 2026 is year to date.
View as table
YearPermits
20142
20158
201617
20176
201814
201931
202022
202156
202257
202320
20241
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical225
  • Solar91
  • Battery storage30
  • Roofing15
  • Additions2
  • New construction2
  • HVAC1
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical221
  • Bldg-Alter/Repair10
  • RESIDENTIAL5
  • *Commercial/Non-Residential Building Permit2
  • Existing1
  • Nonbldg-New1
  • Residential Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 4, 2026ElectricalInstallation of a roof-mounted central/string inverter solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Feb 25, 2026ElectricalEplan] plan check only. Supplemental. Changes include running a 200a feed to the backup panel to allow more room to add future loads. Main panel now connected vLos Angeles City—
Feb 25, 2026ElectricalInstall a 6.90kw rooftop solar array and (1) ess on an existing homeHermosa Beach City—
Feb 25, 2026ElectricalInstall a 6.90kw rooftop solar array and (1) ess on an existing homeHermosa Beach City—
Feb 19, 2026ElectricalEss related to solar permit e22-1159. Install (n) ess tesla powerwall 3 & gateway.Culver City City—
Feb 19, 2026ElectricalInstall 1 ess on a home with existing solarCulver City City—
Feb 18, 2026ElectricalInstalling 3.68kw rooftop solar on new residential constructionHermosa Beach City—
Feb 18, 2026ElectricalInstalling 3.68kw rooftop solar on new residential constructionHermosa Beach City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated216
  • Finaled15
  • Active9
  • Completed4
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.