Contractor · HVAC

Chris Riley

17 building permits since 2010 in Boston city, MA; Lexington town, MA and Haverhill city, MA, across 8 counties — $564,650 in reported job value over 15 permits that state one.

Building permits
17
Reported job value
$564.7K
Active
2010–2025
Latest permit
Nov 6, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA7
  • Lexington town, MA3
  • Haverhill city, MA1
  • Walpole town, MA1
  • Wellesley town, MA1
  • Hampton town, NH1
  • Middletown town, RI1
  • Providence city, RI1
  • North Kingstown town, RI1

Permits by year

By issue date (application date where there is none).

048
8
20102018201920202025
View as table
YearPermits
20101
20181
20198
20205
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC6
  • Heat pumps3
  • Gas2
  • Roofing2
  • Plumbing2
  • Demolition2
  • Remodels1
  • Electrical1
  • Water heaters1

Permit types

As the building departments classify them.

  • LVOLT5
  • GAS2
  • Mechanical Permit2
  • Building Permit1
  • Electrical1
  • Mechanical1
  • Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family)1
  • Plumbing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 6, 2025Plumbing Residential Water Heater Replacement (ONLY) Permit—Haverhill City—
May 28, 2020Sheet Metal PermitRemove existing VAV box and replace with new. Install new Liebert CRAC unit with complete supply & exhaust duct systems terminating in register, grilles and difWellesley Town$104,000
Feb 20, 2020Mechanical PermitInstallation of VRF System, associated ERU and Ductless Split SystemMiddletown Town$160,000
Feb 14, 2020Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family)Installation of 2 ton ductless split system and associated pipingWalpole Town$4,100
Feb 10, 2020Mechanical PermitInstall (1) new (3)ton ductless split, (1) ton ductless split and (1) 300 CFM ERV.Providence City$6,500
Jan 24, 2020ElectricalLow voltage control wiring for (2) Fan power boxes, (2) Lab control valves, (2) Exhuast fans and (1) Hot water coilLexington Town$5,000
Dec 30, 2019Mechanicalsome selective demo, replace 2 existing exhaust fans on roof with new duct distribution to accommodate new floor plan, (2) new fan powered boxes, (1) new hot waLexington Town$59,150
Dec 30, 2019Sheet Metalsome selective demo to replace (2) existing exhaust fans on roof with new duct distribution to accommodate new floor plan (2) new fan powered boxes, (1) new hotLexington Town$84,000

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active5
  • Closed4
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.