Contractor · Specialty (solar, fire, telecom)

Wolf River Electric

246 building permits since 2020 in Minneapolis city, MN; Lino Lakes city, MN and St. Francis city, MN, across 2 counties — $2,552,876 in reported job value over 231 permits that state one.

Building permits
246
Reported job value
$2.6M
Active
2020–2026
Latest permit
Sep 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN231
  • Lino Lakes city, MN11
  • St. Francis city, MN2
  • Spring Lake Park city, MN2

Permits by year

By issue date (application date where there is none).

03060
54
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20208
202134
202239
202347
202440
202554
2026 (YTD)24

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar217
  • Roofing213
  • Electrical59
  • Battery storage7
  • HVAC1
  • Remodels1
  • Additions1
  • Plumbing1

Permit types

As the building departments classify them.

  • Res221
  • Building10
  • Commercial10
  • Solar Panels2
  • Electrical1
  • Res Solar Panel1
  • Solar - Roof Mounted1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 23, 2026ResSOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _11.400___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1Minneapolis City$11,400
Sep 10, 2026ResINSTALL NEW FRANKLIN WH ENERGY STORAGE SYSTEM AT SFD - INCLUDING ONE FRANKLIN "aPOWER 2" (15.0 KWH) BATTERY AT BASEMENT (INTERIOR OF SOUTH SIDE FOUNDATION WALL Minneapolis City$1,000
Aug 19, 2026ResSOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.930__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 13Minneapolis City$7,930
Aug 5, 2026ResAddition of 19 Modules to the Existed Roof Mounted PV System (MAA) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _8.075___ KW SOLAR CHECKLISMinneapolis City$8,075
Jul 16, 2026ResINSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY __8.925__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Minneapolis City$8,925
Jun 23, 2026CommercialINSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __40.8__ KW ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELECTRICAL PERMIT (STATE OF MN). INMinneapolis City$40,800
Jun 9, 2026ResINSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING -ACW COLLECTOR CAPACITY _9.350___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 SMinneapolis City$9,350
Jun 8, 2026ResINSTALL 5.1 kW (DC) FLUSH SOLAR PV SYSTEM (12 MODULES) AT SOUTH SIDE ROOF SLOPE OF SFD. Does the system include battery backup or an uninterrupted power supply Minneapolis City$5,100

Permit status

Where its permits stand, as the departments report them.

  • Closed197
  • Issued23
  • Expired13
  • Finaled10
  • Cancelled3

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.