17 building permits since 2018 in Tigard city, OR and Tualatin city, OR — $1,386,802 in reported job value over 6 permits that state one.
- Building permits
- 17
- Reported job value
- $1.4M
- Active
- 2018–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tigard city, OR12
- Tualatin city, OR5
Permits by year
By issue date (application date where there is none).
048
8
20182021202320252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2021 | 1 |
| 2023 | 1 |
| 2025 | 5 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Gas3
- Plumbing3
- Grading & excavation1
- Remodels1
Permit types
As the building departments classify them.
- Public Facility Improvement - Public Utility Franchise11
- TEMPORARY WATER SERVICE - 3 INCH FIRE HYDRANT METER2
- ALTERATION OR REPAIR - COMMERCIAL1
- Commercial Site Work1
- FRANCHISE1
- PLUMBING - COMMERCIAL SITE UTILITIES1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Public Facility Improvement - Public Utility Franchise | One sidewalk panel cut needs to expose and operate existing HOS gas valve. Needs to be brought up to code. | Tigard | — |
| Oct 1, 2026 | Public Facility Improvement - Public Utility Franchise | Install new 1"(P) svc at 11597 SW 70th Ave, Tigard, OR. One 4'x5' and one 2'x3' soft-surface cut are needed over the main on SW Baylor St; the main is 4' in the | Tigard | — |
| Aug 13, 2026 | FRANCHISE | M6274579 CC KEM | Tualatin City | — |
| Aug 3, 2026 | Public Facility Improvement - Public Utility Franchise | Cut and cap 3/4" (W) svc at main at 9220 SW Millen Dr, Tigard, OR. One 12'x7' concrete cut is needed over the valve; the valve is 6' in the ROW. WO# 10409944 | Tigard | — |
| Jul 7, 2026 | Public Facility Improvement - Public Utility Franchise | M6246897-KEM: Restore 21.5' x 7.5' and 7.5' x 4' sections of sidewalk and driveway apron for house 12790. this is re-work from work originally permitted under P | Tigard | — |
| May 19, 2026 | Public Facility Improvement - Public Utility Franchise | Replace svc with 1/2"(P) svc and install 475EFV at 6511 SW Walnut Ter, Tigard, OR. One 4'x5' asphalt cut is needed over the main on SW Walnut Terrace; the main | Tigard | — |
| Apr 7, 2026 | Public Facility Improvement - Public Utility Franchise | I'm not sure if this work is related to a Rigard Capitol Improvement Project. I was given K23763. I've also applied for a permit with ODOT. Relocate or lower th | Tigard | — |
| Feb 5, 2026 | Public Facility Improvement - Public Utility Franchise | Replace existing gas service due to build over. install EFV at main. One 5'x5' gravel cut needed. WO 10317132 | Tigard | $250 |
Permit status
Where its permits stand, as the departments report them.
- Closed7
- Issued4
- Finaled4
- Expired2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.