Contractor · Electrical

Marco Desrochers

246 building permits since 2017 in Providence city, RI; Warwick city, RI and Cranston city, RI, across 5 counties — $3,379,535 in reported job value over 223 permits that state one.

Building permits
246
Reported job value
$3.4M
Active
2017–2026
Latest permit
Oct 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI77
  • Warwick city, RI62
  • Cranston city, RI13
  • East Providence city, RI12
  • West Warwick town, RI9
  • Coventry town, RI7
  • Lincoln town, RI7
  • North Kingstown town, RI7
  • Woonsocket city, RI6
  • North Providence town, RI5

Permits by year

By issue date (application date where there is none).

02550
50
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20178
201810
201912
202028
202142
202216
202350
202441
202520
2026 (YTD)19

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical239
  • HVAC23
  • Additions20
  • Bathrooms9
  • Remodels7
  • Demolition7
  • Kitchens5
  • Generators3
  • Electric meters3
  • Gas2

Permit types

As the building departments classify them.

  • Electrical Permit219
  • 2) Electrical Permit13
  • Fire Alarm Permit9
  • EG Electrical Permit2
  • Building Permit1
  • ELECT1
  • Franklin Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 20, 2026ELECTdirect replacement of existing parking lot lighting poles and basesBellingham Town$50,000
Oct 14, 2026Electrical PermitReplacement of all building cameras and access control throughout entire building in response to fire. All wires will need to be re-run. All locations staying tLincoln Town$25,000
Aug 6, 2026Electrical PermitTrench from two poles to replace pvc piping due to an underground pipe failure. Work proposed to be performed on Thursday August 6th, with the trench being openCoventry Town$4,500
Jul 17, 2026Electrical PermitWill pull new secondaries to newer 2000A 277/480v switchgear in building (due to recent failure - Reference emergency permit# 26-5035) and re-feed old switchgeaWarwick City$155,000
Jul 7, 2026Electrical PermitEmergency permit for temporary generators hookup and replacement of secondary wiring.Warwick City$10,000
Jun 11, 2026Electrical PermitEmergency electrical repair of display freezers. Addition of subpanel to existing panelboard to accommodate future expansion.West Warwick Town$2,250
Jun 1, 2026Electrical PermitAddition of power/lighting for new 1st floor street-level vestibuleProvidence City$1,500
May 18, 2026Electrical PermitRetrofit 4 new VFDs to exhisting HVAC equipmentProvidence City$5,500

Permit status

Where its permits stand, as the departments report them.

  • Completed165
  • Active73
  • Stop work ordered7
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.