Contractor · General building

ADT Solar, LLC, T/A Energypro

17 building permits since 2021 in Pender County, NC — $499,574 in reported job value over 10 permits that state one.

Building permits
17
Reported job value
$499.6K
Active
2021–2023
Latest permit
Jun 5, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Pender County, NC17

Permits by year

By issue date (application date where there is none).

0510
9
202120222023
View as table
YearPermits
20217
20229
20231

Type of work

Permits describing each kind of work; one permit can cover several.

  • Additions16
  • Solar15
  • Electrical5
  • Roofing4
  • Battery storage2

Permit types

As the building departments classify them.

  • Residential Additions16
  • Residential Electrical Stand Alone Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 5, 2023Residential AdditionsInstallation of 25 roof mounted solar panels, also 2 Enphase Encharge 10kWh batteries which will require a same day disconnect/reconnect of power.Pender County—
Nov 7, 2022Residential AdditionsInstallation of 25 roof mounted solar panels on a existing residence.Pender County$42,818
Oct 13, 2022Residential AdditionsInstallation of 19 roof mounted solar panels on a existing residence.Pender County$54,254
Sep 13, 2022Residential AdditionsInstallation of 32 GROUND MOUNTED solar panels, also performing a service upgrade which will require a SAME DAY DISCONNECT/RECONNECT OF POWER.Pender County—
Sep 8, 2022Residential AdditionsInstallation of Roof Mounted Solar with 2 Enphase Encharge 10kWh batteries.Pender County$91,973
Aug 17, 2022Residential AdditionsInstallation of Roof Mounted Solar PhotovoltaicPender County—
Aug 1, 2022Residential AdditionsInstallation of Roof Mounted SolarPender County$32,466
Jul 21, 2022Residential AdditionsInstallation of 32 roof mounted solar panels also performing a Main Breaker Swap which will require a same day DISCONNECT/RECONNECT of power.Pender County—

Permit status

Where its permits stand, as the departments report them.

  • Expired11
  • Completed5
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.