Contractor · Specialty (solar, fire, telecom)
GOLD RUSH ENERGY SOLUTIONS
247 building permits since 2017 in Marin County, CA; Sacramento County, CA and Sacramento city, CA, across 18 counties — $5,433,331 in reported job value over 195 permits that state one.
- Building permits
- 247
- Reported job value
- $5.4M
- Active
- 2017–2025
- Latest permit
- Mar 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marin County, CA48
- Sacramento County, CA38
- Sacramento city, CA28
- Tuolumne County, CA26
- Davis city, CA22
- Elk Grove city, CA12
- Los Angeles city, CA12
- San Jose city, CA12
- Chico city, CA6
- Madera city, CA6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 2 |
| 2019 | 22 |
| 2020 | 23 |
| 2021 | 95 |
| 2022 | 57 |
| 2023 | 31 |
| 2024 | 7 |
| 2025 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar181
- Electrical71
- Plumbing25
- Water heaters22
- Roofing20
- Battery storage10
- HVAC3
- Generators3
- Electric meters2
- Gas1
Permit types
As the building departments classify them.
- RESIDENTIAL48
- Single Family26
- MISR24
- PHOTOVALTIC RESIDENTIAL20
- ROOF MOUNT SOLAR19
- Electrical13
- 1 & 2 Family Residential12
- ELECTRICAL12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 15, 2025 | CBNR | ground Mount Solar Install, 5.2kw System Size, 13 PV Modules, ch-01, increase module quantity to 15 for 5.55kWdc system size, solar interconnection to occur in | Sacramento County | $15,045 |
| Mar 15, 2025 | MISR | Roof Mount Solar Install, 2.96kw System Size, 8 PV Modules | Sacramento County | $12,670 |
| Mar 15, 2025 | RERR | IN PROGRESS INSP REQUIRED; Tear off, Re-sheath and Reroof 27 Squares GAF Timberline HDZ-RS Comp Shingle Aged Chestnut 0676-0130a | Sacramento County | $16,875 |
| Feb 26, 2025 | Solar System | Reviewed by SolarApp+ 7290kw Solar PV System, and nullgal Solar WH System (water heater installed null). | Sacramento | $21,870 |
| Dec 16, 2024 | — | Residential: Solar Panels (Roof-Mounted), Residential: Energy Storage System | Amador County | $29,598 |
| Aug 19, 2024 | — | Residential: RMPV & ESS | Amador County | $29,500 |
| May 3, 2024 | MISR | Roof Mount Solar Install, 5.53kw System Size, 14 PV Modules, 1 Enphase Storage Battery | Sacramento County | $31,867 |
| Apr 1, 2024 | PV & ES Systems | 5.53 kW ROOF MOUNTED GRID TIED PV SYSTEM | Santa Cruz City | $21,800 |
Permit status
Where its permits stand, as the departments report them.
- Not stated91
- Issued61
- Completed52
- Expired12
- Closed11
- Finaled10
- Cancelled3
- Withdrawn3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.