Contractor · General building
Villa Homes
18 building permits since 2022 in Santa Cruz city, CA; Contra Costa County, CA and Los Angeles city, CA, across 4 counties — $1,041,582 in reported job value over 13 permits that state one.
- Building permits
- 18
- Reported job value
- $1M
- Active
- 2022–2026
- Latest permit
- Aug 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Cruz city, CA11
- Contra Costa County, CA3
- Los Angeles city, CA3
- Pleasanton city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 7 |
| 2024 | 4 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Accessory dwelling units14
- Electrical2
- New construction2
- Plumbing1
- Electric meters1
- Fire sprinklers1
Permit types
As the building departments classify them.
- Residential Building9
- Electrical2
- Master Water2
- Bldg-New1
- MHF1
- MHU1
- MP1
- Plumbing1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 4, 2026 | MHF | PERMANENT FOUNDATION FOR 800SF MANUFACTURED HOME **SEE BIMP26-001318 AND BIMHU26- 001317 ON SAME SET OF PLANS** | Contra Costa County | $13,400 |
| Aug 4, 2026 | MHU | UNTILITY HOOK UP FOR 800 SF MANUFACTURED HOME **SEE BIMP26-001318 AND BIMHF26- 001316 ON SAME SET OF PLANS | Contra Costa County | $1,000 |
| Aug 4, 2026 | MP | 800 sq. ft. HUD-Approved Manufactured ADU on a permanent foundation. ADU to be equipped with fire sprinklers. **SEE BIMHF26-001316 AND BIMHU26- 001317 ON SAME S | Contra Costa County | $128,000 |
| Feb 13, 2026 | Electrical | Upgrade 100amp main panela to 400amp panel for 2 meters 100a for main home 125a for adu. | Pleasanton City | — |
| Nov 12, 2024 | Residential Building | (N) Detached ADU | Santa Cruz City | $82,170 |
| Aug 13, 2024 | Master Water | New Detached Manufactured ADU | Santa Cruz City | — |
| Aug 12, 2024 | Residential Building | New Manufactured Detached ADU | Santa Cruz City | $88,000 |
| Feb 7, 2024 | Master Water | Two - New Detached ADUs | Santa Cruz City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Issued3
- Expired2
- Not stated2
- Finaled1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.