Contractor · Specialty (solar, fire, telecom)

Graeme Richard

248 building permits since 2022 in Fitchburg city, MA; Lexington town, MA and Marlborough city, MA, across 14 counties — $4,712,351 in reported job value over 200 permits that state one.

Building permits
248
Reported job value
$4.7M
Active
2022–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fitchburg city, MA29
  • Lexington town, MA23
  • Marlborough city, MA17
  • Boston city, MA8
  • Methuen city, MA7
  • Salem city, MA7
  • Randolph Town city, MA7
  • Beverly city, MA6
  • Haverhill city, MA6
  • Sharon town, MA6

Permits by year

By issue date (application date where there is none).

0100200
152
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20236
20249
2025152
2026 (YTD)80

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar176
  • Electrical140
  • Battery storage12
  • Roofing5
  • Electric meters4
  • Remodels3
  • Bathrooms1
  • EV chargers1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical Permit68
  • ELECT.16
  • Building Permit14
  • Building Permit / Use and Occupancy14
  • Electrical12
  • RESI.11
  • Solar Panels11
  • Electrical Permit - Residential 1 & 2 Family10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Building Permit15 KW solar system install. 32 modules. Ground Mount. No structural. 1 Tesla Powerwall 3.Rutland Town$10,000
Oct 27, 2026Building PermitSolar system install of 2 Ground mount systems. Gound mount #1 -18,200 KW, 40 panels and 1 Tesla Powerwall 3 battery. No structural. Ground mount #2 - 18,200 KWRutland Town$10,000
Oct 19, 2026Building Permit - Solar (PV) Permit for 1 & 2 Family9.240 KW solar system install. 21 Panels. Rooftop. No ESS. Roof rafter sistering. **ROUGH FRAMING INSPECTION REQUIRED AFTER RAFTER SISTERING PRIOR TO PANEL INSTMarlborough City—
Oct 15, 2026COMM.20,500 KW solar system install. 50 panels. Rooftop. No ESS. No structural.Avon Town$51,250
Oct 15, 2026ELECT.20,500 KW solar system install. 50 panels. Rooftop. No ESS. No structural.Avon Town$41,250
Oct 15, 2026Electrical Permit - Residential 1 & 2 Family—Marlborough City$13,100
Oct 14, 2026Building Permit4,000 KW solar system install. 10 panels. Rooftop. No ESS. No structural.Clinton Town$3,000
Oct 14, 2026Electrical Permit—Rutland Town$81,000

Permit status

Where its permits stand, as the departments report them.

  • Completed165
  • Active48
  • Closed16
  • Issued11
  • Stop work ordered3
  • Finaled2
  • Cancelled2
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.