Contractor · General building
Sal Bonina
18 building permits since 2014 in Stamford town, CT — $7,111,700 in reported job value over 18 permits that state one.
- Building permits
- 18
- Reported job value
- $7.1M
- Active
- 2014–2020
- Latest permit
- May 15, 2020
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT18
Permits by year
By issue date (application date where there is none).
036
6
2014201620182020
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 6 |
| 2015 | 3 |
| 2016 | 4 |
| 2017 | 1 |
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels12
- Bathrooms3
- Windows & doors3
- HVAC2
- Electrical2
- Kitchens1
- Additions1
- Plumbing1
- Demolition1
- Fire sprinklers1
Permit types
As the building departments classify them.
- Building Permit18
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 15, 2020 | Building Permit | Stamford URC Property - Vacant Lot at Corner of Main Street and Grey Rock Place. Provide new electric, water and sanitary service connections from street. for f | Stamford Town | $90,000 |
| Mar 30, 2020 | Building Permit | Replace heat riser piping throughout building, cut and patch walls as required. | Stamford Town | $742,700 |
| Oct 10, 2019 | Building Permit | Interior alterations including new floorcovering, painting, new kitchenette cabinets in Community Room and converting empty space to a new office | Stamford Town | $98,000 |
| Jul 24, 2018 | Building Permit | Ground Floor of Renovate Security Office, bathroom and add another bathroom, Phase 2. Approx. 973.sqft. ***Shop drawings for sprinklers must be submitted to and | Stamford Town | $131,000 |
| Nov 22, 2017 | Building Permit | Renovations to bathrooms, new flooring, and install new cabinet doors and drawer faces (27 apartment units), remove existing tubs and replace with new shower un | Stamford Town | $403,000 |
| Dec 15, 2016 | Building Permit | Construct new addition for elevator at Dolan School *The original pin number was TB-16-2467 1-30-2017 RDM* | Stamford Town | $1,147,000 |
| Oct 27, 2016 | Building Permit | Add 14 x 6 mechanical room for DI water equipment at Blood Lab Area 1/30/17 REVISIED TO INCLUDE LABORARORY RENOVATIONS GROUND FLOOR NEED TO REVISIT ZONING, EPB, | Stamford Town | $10,000 |
| Oct 4, 2016 | Building Permit | Selective interior Demolition at Blood Lab | Stamford Town | $30,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed13
- Active5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.