Contractor · Other trades
ROBINSON DAVID WAYNE
18 building permits since 2018 in Santa Cruz County, CA.
- Building permits
- 18
- Reported job value
- —
- Active
- 2018–2026
- Latest permit
- Mar 30, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA18
Permits by year
By issue date (application date where there is none).
02.55
5
2018202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 5 |
| 2021 | 3 |
| 2022 | 2 |
| 2023 | 3 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical3
- Windows & doors3
- Solar2
- Roofing2
- HVAC1
- Grading & excavation1
- Remodels1
- Telecom1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Building18
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 30, 2026 | Building | DO NOT ISSUE WITHOUT CONTRACTOR LISTED ON PLG-200 Construction Change Document #1 to Permit B-236177 to include following: Original plans submitted electronical | Santa Cruz County | — |
| Jan 8, 2026 | Building | Boulder Creek FPD/SRA High Decommission existing AT&T site which consists of the following: Remove all AT&T antennas and antenna equipment. Remove AT&T equipmen | Santa Cruz County | — |
| Dec 16, 2025 | Building | Extension #2 B-256836 granted to B- 236177 until 5/4/26. TG 12/11/25 | Santa Cruz County | — |
| Dec 18, 2024 | Building | 6 month extension to issued building permit b-236177 to get permit issued | Santa Cruz County | — |
| Feb 20, 2024 | Building | Recognize the construction of 2,027 sq. ft. of CMU block retaining walls surrounding gravel patio, recognize 216 sq. ft. of as built wood deck and stairs, and r | Santa Cruz County | — |
| Dec 26, 2023 | Building | Extension to application B-204533 to extend until 6/21/2024 | Santa Cruz County | — |
| Jun 16, 2023 | Building | Construction Change Document #1 to Permit B-222756 to include change in system size to match install roof mount (14.04)kW, (36) modules photovoltaic electrical | Santa Cruz County | — |
| May 12, 2023 | Building | 6 month extension to issued building permit B-221700 to 12/30/2023 | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active5
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.