Contractor · Electrical

NEAL ELECTRIC CORP

18 building permits since 2013 in Los Angeles city, CA; Vista city, CA and San Diego County, CA, across 2 counties — $60,000 in reported job value over 3 permits that state one.

Building permits
18
Reported job value
$60K
Active
2013–2024
Latest permit
Jul 11, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA9
  • Vista city, CA6
  • San Diego County, CA3

Permits by year

By issue date (application date where there is none).

07.515
12
20132014201520192024
View as table
YearPermits
20131
201412
20153
20191
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Solar2
  • Remodels2
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical9
  • BLDG COMBINATION 0712103
  • Existing3
  • Building Meter Release/New Weather Head1
  • Building Misc - Photovoltaic System (PV)1
  • Building Temporary Power Pole1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 11, 2024Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—
Oct 22, 2019Building Temporary Power PoleTEMPORARY GENERATORVista City—
Aug 18, 2015Electrical[[[[6/30/14]]]] CHANGES TO APPROVED SET OF PLANS. DELTA 5 CHANGES ONLYLos Angeles City—
Mar 25, 2015ExistingREPLACE EXISTING 2000 AMP 277/480 SERVICESan Diego County—
Mar 9, 2015Building Meter Release/New Weather HeadNew Electrical Weatherhead/Replace RiserVista City—
Oct 3, 2014ExistingMISC ELEC TO ADD SUB-PANEL - 3 PHASE LOAD CENTER WIRING FOR EXISTING 200 AMP WELLSan Diego County—
Aug 21, 2014ElectricalINSTALLATION OF NEW FIRE ALARM SYSTEM IN 2-STORY BUILDING. BUILDING OCLos Angeles City—
Aug 21, 2014ElectricalBuilding 4 of 5: TACTIAL RANGE. INSTALL NEW ELECTRICAL PANELS, NEW COLos Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated9
  • Finaled5
  • Completed3
  • Issued1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.