Contractor · General building

Michael Harris at Tower, LLC

18 building permits since 2025 in Rockville city, MD.

Building permits
18
Reported job value
—
Active
2025–2026
Latest permit
Jul 23, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Rockville city, MD18

Permits by year

By issue date (application date where there is none).

0510
9
20252026*
* 2026 is year to date.
View as table
YearPermits
20259
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Gas13
  • Bathrooms10
  • New construction10
  • Windows & doors6
  • Plumbing2
  • HVAC1
  • Kitchens1
  • Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 23, 2026—CONSTRUCT NEW TOWNHOME (LOT 13, BLOCK B) UNIT B, ELEVATION 3 w-BRICK FRONT, PER PLAN, ELEVATOR, LOWER LEVEL POWDER RM., ALT. 3RD FLOOR PLAN, REAR BAY WINDOW - PRockville City—
Jul 23, 2026—CONSTRUCT A NEW MPDU TOWNHOME (LOT 15, BLOCK B), UNIT A, ELEVATION 1 REVERSE PLAN [IRC; No Gas Connections, 1" Water Meter]Rockville City—
Jul 23, 2026—CONSTRUCT A NEW TOWNHOME (LOT 17, BLOCK B) UNIT B, ELEVATION 3 w-BRICK FRONT AND SIDE, REVERSE PLAN, ELEVATOR, LOWER LEVEL POWDER RM., BAY WINDOW - DINING RM., Rockville City—
Jul 23, 2026—CONSTRUCT NEW MPDU TOWNHOME (LOT 16, BLOCK B) UNIT A, ELEVATION 1 w-BRICK FRONT, REVERSE PLAN [IRC; No Gas Connections, 1" Water Meter]Rockville City—
Jul 23, 2026—CONSTRUCT NEW MPDU TOWNHOME (LOT 14, BLOCK B) UNIT A, ELEVATION 1, PER PLAN [IRC; No Gas Connections, 1" Water Meter]Rockville City—
Jul 22, 2026—CONSTRUCT A NEW TOWNHOME (LOT 10, BLOCK B) UNIT B, ELEVATION 2 w-BRICK FRONT, PER PLAN, ELEVATOR, LOWER LEVEL POWDER RM., ALT 3RD FLOOR PLAN, REAR BAY WINDOW - Rockville City—
Jul 22, 2026—CONSTRUCT NEW TOWNHOME (LOT 11, BLOCK B) UNIT B, ELEVATION 1 w-BRICK FRONT, PER PLAN, ELEVATOR, LOWER LEVEL POWDER RM., ALT 3RD FLOOR PLAN, REAR BAY - PRIMARY BRockville City—
Jul 22, 2026—CONSTRUCT A NEW TOWNHOME (LOT 12, BLOCK B) UNIT B, ELEVATION 3 w-BRICK FRONT, PER PLAN, ELEVATOR, LOWER LEVEL POWDER RM., ALT 3RD FLOOR PLAN, REAR BAY WINDOW - Rockville City—

Permit status

Where its permits stand, as the departments report them.

  • Issued8
  • Reviews in progress8
  • Closed1
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.