Contractor · Electrical
Michael DeLuca
18 building permits since 2017 in Cortlandt town, NY; Mamaroneck town, NY and Mount Pleasant town, NY, across 2 counties — $87,200 in reported job value over 5 permits that state one.
- Building permits
- 18
- Reported job value
- $87.2K
- Active
- 2017–2026
- Latest permit
- Oct 5, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cortlandt town, NY5
- Mamaroneck town, NY4
- Mount Pleasant town, NY4
- Stamford town, CT3
- New Canaan town, CT1
- White Plains city, NY1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2023 | 4 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical17
- HVAC3
- Bathrooms3
- Gas2
- Kitchens2
- Remodels2
- Generators2
- Additions1
Permit types
As the building departments classify them.
- Electrical Permit7
- Electrical Application5
- Electrical Permit Application4
- Building Permit1
- COM - ELEC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 5, 2026 | Electrical Permit | wiring for new septic pump 120v wiring for new septic alarm 120v | Stamford Town | $2,800 |
| Sep 25, 2026 | Electrical Permit Application | Electrical: Recessed lights, switches, outlets, change electrical panel | Mamaroneck Town | — |
| Sep 16, 2026 | Building Permit | Installation of one Generac 26KW propane generator with one 200-amp ATS transfer switch. | Stamford Town | $30,000 |
| Aug 31, 2026 | Electrical Permit | Install a new 200 amp underground service,Install conduits for future driveway gate,install one 26kw generator with one 200 amp ATS switch. | Stamford Town | $42,000 |
| Jul 27, 2026 | Electrical Application | 2nd fllor Master Bedroom/Master bathroom/ storage room. Install 16 lights, Outlets 9, Gfci. 2, 2 smokes, 1 carbon/ smoke, 7 switches, First floor/ living room/ | Cortlandt Town | — |
| Jul 6, 2026 | Electrical Permit | Kitchen - install 15 outlets,5 switches,10 recessed lights,1 lighting circuit, microwave, dish washer, disposal, fridge, cook top gas, hood, refrigerator, doubl | Mount Pleasant Town | — |
| Dec 2, 2025 | Electrical Permit | Relocation of wiring for primary bathroom,Guest bathroom,Kids bathroom use exsisting wiring add recessed lights relocate outlets and switches add new exhaust fa | New Canaan Town | — |
| Oct 7, 2025 | Electrical Permit Application | Electrical: Installation of one 20 amp line for one AC Condenser | Mamaroneck Town | — |
Permit status
Where its permits stand, as the departments report them.
- Active9
- Completed8
- Closed1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.