Contractor · General building

MAHLER FRED

18 building permits since 2012 in Santa Cruz County, CA.

Building permits
18
Reported job value
—
Active
2012–2022
Latest permit
Sep 14, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA18

Permits by year

By issue date (application date where there is none).

024
4
20132015201720202022
View as table
YearPermits
20123
20131
20144
20151
20161
20173
20191
20201
20212
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms7
  • Roofing6
  • Kitchens5
  • Remodels5
  • Plumbing5
  • Electrical5
  • Windows & doors3
  • Additions2
  • Water heaters2
  • Gas1

Permit types

As the building departments classify them.

  • Building18

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 14, 2022BuildingDeferred Submittal #1 to B-195690, to include roof truss calculations and drawings.Santa Cruz County—
Sep 14, 2021BuildingConstruct a 198 sq. ft. addition for the master bath and a 224 sq. ft. addition to the front of the existing SFD. Permit to include a 200 sq. ft. interior kitchSanta Cruz County—
Aug 3, 2021BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better appSanta Cruz County—
Feb 5, 2020BuildingReplace water heater with associated piping and venting at an existing at an existing structure. Install minimum 1.5”m piping insulation for the first 5 feet ofSanta Cruz County—
Feb 28, 2019BuildingTo extend Building Permit B-163921 until 8/28/19Santa Cruz County—
May 30, 2017BuildingChange Order to B-164005 (REM) to expand concrete retaining wall (3'-4") at both sides of deck.Santa Cruz County—
Mar 7, 2017BuildingLRA Interior remodel (502sq ft.) at an existing 1-story (2) bedroom, (2) bath SFD to include kitchen/dining area and master-bath. Install insert into existing mSanta Cruz County—
Feb 13, 2017BuildingLRA, Central Fire, Replace electric service panel with new 125A service panel at an existing single family dwelling. Install listed smoke detectors and carbon mSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Active5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.