Contractor · Plumbing
LOUIS DICARLO
18 building permits since 2017 in Buffalo city, NY and Clarence town, NY — $317,450 in reported job value over 18 permits that state one.
- Building permits
- 18
- Reported job value
- $317.5K
- Active
- 2017–2026
- Latest permit
- Sep 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY17
- Clarence town, NY1
Permits by year
By issue date (application date where there is none).
048
7
20172020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 1 |
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 7 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing18
- Electrical4
- Water heaters3
- Bathrooms2
- Gas1
- Roofing1
- Additions1
Permit types
As the building departments classify them.
- PLUMBING17
- Plumbing (Water Service)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 10, 2026 | PLUMBING | New sanitary and car wash primary and secondary drain lines below slab. Complete rough in of 1 toilet room, approx. 40 ft of trench drain. | Buffalo City | $100,000 |
| Jan 23, 2025 | PLUMBING | Supply (2) 12" sections of trench drain tile into ext. co. for OWS; install (1) floor sink, (4) 4" waste line for debris sep. (final hookups by Detla Sonic), (1 | Buffalo City | $40,000 |
| Dec 17, 2024 | PLUMBING | BRING 4" SANITARY & 3/4" WATER SERVICE INSIDE OF HOUSE FOOTPRINT | Buffalo City | $15,200 |
| Jun 26, 2024 | PLUMBING | Install approximately 10’ of trench drain in basement of lube center, supply and install (1) electric hot water heater, (13) floor drains, (2) hand sinks, and ( | Buffalo City | $40,000 |
| Nov 20, 2023 | PLUMBING | Supply supply drain, vent and domestic water to the following fixtures: (2) ADA water closets, (2) ADA wall hung lavs, (2) trap primered floor drains, (1) MSB a | Buffalo City | $56,000 |
| Nov 28, 2022 | PLUMBING | RUN SANITARY SEWER FROM TAP TO APPROX. 5'OUTSIDE OF FOOTPRINT. RUN STORM SEWER FROM TAP TO FINAL CONNECTIONS AT DOWNSPOUTS. | Buffalo City | $3,500 |
| Nov 10, 2022 | Plumbing (Water Service) | Plumbing (Water Service) | Clarence Town | $9,000 |
| Nov 4, 2022 | PLUMBING | RUN SANITARY SEWER FROM TAP TO APPROXIMATELY 5' OUTSIDE FOOTPRINT. RUN DTORM SEWER FROM TAP TO CONDUCTORS. WATER SERVICE FROM TAP TO APPROXIMATELY 5' OUTSIDE FO | Buffalo City | $2,500 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.