Contractor · Plumbing
MARC A MALETON
252 building permits since 2017 in Greenwich town, CT; Stratford town, CT and Norwalk town, CT, across 2 counties — $397,446 in reported job value over 56 permits that state one.
- Building permits
- 252
- Reported job value
- $397.4K
- Active
- 2017–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT224
- Stratford town, CT17
- Norwalk town, CT5
- Trumbull town, CT4
- Monroe town, CT2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2020 | 2 |
| 2021 | 8 |
| 2022 | 40 |
| 2023 | 44 |
| 2024 | 50 |
| 2025 | 65 |
| 2026 (YTD) | 41 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing158
- Bathrooms148
- Kitchens74
- Gas69
- HVAC64
- Water heaters41
- Remodels26
- Generators15
- Electrical12
- Heat pumps8
Permit types
As the building departments classify them.
- PLU175
- HVAC37
- Plumbing Permit17
- PL28
- Residential Plumbing Permit4
- Mech No Fee3
- BUI - Residential2
- HV22
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | PLU | UNDERGROUND OR INSLAB WORK ONLY ALLOWED Foundation only permit: Install u.g. plumbing pipes and waterline within house with sewer line extending SH outside foun | Greenwich Town | — |
| Oct 15, 2026 | PLU | install existing gas line to new outdoor grill, 20 feet (3/4) (underground) gas line. Install shut-off gas valve inside the grill, pressure test gas line from e | Greenwich Town | — |
| Oct 7, 2026 | PLU | 1 new powder bathroom toilet, snk., 1 nw: 1/2" gas line to fireplace. 1st flr. : 1 nw: wc, snk., | Greenwich Town | — |
| Sep 30, 2026 | HVAC | install new boiler and indirect water heater, including radiant floor heating system for first floor; all associated piping, connections, controls, and related | Greenwich Town | — |
| Aug 20, 2026 | PLU | 1st fl.: renovate kitchen, sink, d/w, icemaker, waterline; master bathroom, free-standing tub; relocate shower; relocate double isnk, vanity, relocate toilet, r | Greenwich Town | — |
| Aug 17, 2026 | HVAC | provide and install a completely new heating and a/c system for the house; the work includes 5 separate hvac systems serving the designated areas of the house, | Greenwich Town | — |
| Aug 13, 2026 | PLU | 1st fl.: bathroom: toilet, sink, shower, shower drain/shower body; 2nd fl. bathroom: double sink, toilet, convert tub to shower, drain/shower body; 1st fl.: 1 n | Greenwich Town | — |
| Aug 5, 2026 | PLU | renovate garage house 1st flr.: 1 full bath, toilet, sink, shower, laundry setup lower floor, kitchen sink d/w waterline to frig.; relocate gasline to range, ne | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed170
- Active78
- Void4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.