Contractor · Electrical

John Black

18 building permits since 2022 in Mesa city, AZ and Peoria city, AZ — $117,095 in reported job value over 11 permits that state one.

Building permits
18
Reported job value
$117.1K
Active
2022–2025
Latest permit
Oct 28, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ12
  • Peoria city, AZ6

Permits by year

By issue date (application date where there is none).

02.55
5
2022202320242025
View as table
YearPermits
20222
20231
20245
20253

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Solar11
  • Electric meters10
  • EV chargers6
  • Battery storage4

Permit types

As the building departments classify them.

  • Electrical12
  • Residential6

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$15,000
Aug 25, 2025ElectricalPermit is only for installation of one Enphase IQ battery. All work to be performed per 2018 IRC, manufacture’s installation instructions and service utility prMesa$15,000
Aug 21, 2025ElectricalPermit is only for installation of one Enphase IQ battery. All work to be performed per 2018 IRC, manufacture’s installation instructions and service utility prMesa$15,000
Apr 12, 2024ElectricalINSTALLATION OF A 50 AMP CIRCUIT BREAKER FOR A NEMA 14-50 EV CHARGER OUTLET IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANMesa$600
Apr 9, 2024ElectricalINSTALLATION OF A 50 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTAMesa$600
Apr 9, 2024ElectricalINSTALLATION OF A 50 AMP CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER (NEMA 14-50) IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INMesa$700
Mar 15, 2024ElectricalINSTALLATION OF A NEW 48 AMP EV CHARGER PROTECTED BY A 60 AMP CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METERMesa$1,330
Jan 16, 2024ElectricalInstallation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO Mesa$3,000

Permit status

Where its permits stand, as the departments report them.

  • C/o issued11
  • Finaled5
  • Issued1
  • Reviews in progress1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.