Contractor · Electrical
John Black
18 building permits since 2022 in Mesa city, AZ and Peoria city, AZ — $117,095 in reported job value over 11 permits that state one.
- Building permits
- 18
- Reported job value
- $117.1K
- Active
- 2022–2025
- Latest permit
- Oct 28, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ12
- Peoria city, AZ6
Permits by year
By issue date (application date where there is none).
02.55
5
2022202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 5 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical12
- Solar11
- Electric meters10
- EV chargers6
- Battery storage4
Permit types
As the building departments classify them.
- Electrical12
- Residential6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $15,000 |
| Aug 25, 2025 | Electrical | Permit is only for installation of one Enphase IQ battery. All work to be performed per 2018 IRC, manufacture’s installation instructions and service utility pr | Mesa | $15,000 |
| Aug 21, 2025 | Electrical | Permit is only for installation of one Enphase IQ battery. All work to be performed per 2018 IRC, manufacture’s installation instructions and service utility pr | Mesa | $15,000 |
| Apr 12, 2024 | Electrical | INSTALLATION OF A 50 AMP CIRCUIT BREAKER FOR A NEMA 14-50 EV CHARGER OUTLET IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MAN | Mesa | $600 |
| Apr 9, 2024 | Electrical | INSTALLATION OF A 50 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTA | Mesa | $600 |
| Apr 9, 2024 | Electrical | INSTALLATION OF A 50 AMP CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER (NEMA 14-50) IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE IN | Mesa | $700 |
| Mar 15, 2024 | Electrical | INSTALLATION OF A NEW 48 AMP EV CHARGER PROTECTED BY A 60 AMP CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER | Mesa | $1,330 |
| Jan 16, 2024 | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | $3,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued11
- Finaled5
- Issued1
- Reviews in progress1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.