Contractor · Electrical
JAIRO GUERRERO
18 building permits since 2024 in Norwich town, CT; Griswold town, CT and Stonington town, CT, across 3 counties — $95,400 in reported job value over 17 permits that state one.
- Building permits
- 18
- Reported job value
- $95.4K
- Active
- 2024–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Norwich town, CT10
- Griswold town, CT3
- Stonington town, CT2
- Rocky Hill town, CT1
- Stratford town, CT1
- Groton town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 3 |
| 2025 | 3 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical18
- Kitchens8
- Bathrooms8
- HVAC3
- Electric meters2
- Heat pumps1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit15
- Stonington Electrical Permit2
- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Electrical Permit | electrical work in two bedrooms 1 bathroom 1 living space installation of hard wire smoke detectors in bedrooms installation of 20amp circuit for outlets and li | Stratford Town | $6,000 |
| Sep 15, 2026 | Electrical | Replacement of electrical service and panel for 200 amp Installation of recess lights Replacement electrical devices Electrical rough in of basement | Groton Town | $10,000 |
| Sep 4, 2026 | Electrical Permit | replacement of all ectrical devices for temper resisters installation of recess lights installation of deemer switches installation of gfci and arc fault protec | Norwich Town | $4,000 |
| Aug 20, 2026 | Electrical Permit | - New electrical rough in of kitchen, 2 counter 20 amp circuits, 2 - 20 amp circuits for dishwasher and fridge - new electrical rough in for bathroom, 20 Amp ci | Norwich Town | $4,000 |
| Jul 28, 2026 | Stonington Electrical Permit | Installation of 30 amp 240volts circuit for ac unit Installation of gfci for service outlet | Stonington Town | $700 |
| Jun 18, 2026 | Electrical Permit | - electrical rough in of basement office, bathroom, gym and living area - installation of new 12/2 home runs for office and common areas - Installation of gfci | Norwich Town | $6,000 |
| May 21, 2026 | Stonington Electrical Permit | new electrical rough in kitchen, bathrooms, bedrooms and livingroom. Installation of hardwire smoke detectors temper resister outlets arc fault breakers | Stonington Town | $16,000 |
| May 15, 2026 | Electrical Permit | -new electrical rough in for kitchen -new electrical rough in for master bathroom -Installation of recces lights in living room and master bedroom - replacement | Norwich Town | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Active9
- Completed7
- Issued1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.