Contractor · General building

Garrett Evans

18 building permits since 2018 in Providence city, RI; Warren town, RI and Narragansett town, RI, across 4 counties — $412,262 in reported job value over 13 permits that state one.

Building permits
18
Reported job value
$412.3K
Active
2018–2026
Latest permit
Sep 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI4
  • Warren town, RI2
  • Narragansett town, RI2
  • South Kingstown town, RI2
  • Barrington town, RI1
  • Bristol town, RI1
  • Middletown town, RI1
  • Newport city, RI1
  • Burrillville town, RI1
  • North Providence town, RI1

Permits by year

By issue date (application date where there is none).

024
4
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20182
20192
20201
20211
20221
20232
20241
20254
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms4
  • Windows & doors4
  • Kitchens3
  • Roofing3
  • Additions3
  • Plumbing3
  • HVAC2
  • Remodels2
  • Demolition2
  • Electrical2

Permit types

As the building departments classify them.

  • Building Permit18

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2026Building PermitFurnish and install structural renovations in accordance with Engineers stamped Drawing S1 issued for construction Sept 18, 2026 by McBrie, LLC Structural DesigWarren Town$46,261
Aug 4, 2026Building Permit—North Kingstown Town—
Jul 30, 2026Building PermitRemove garage roof. Frame second and third story addition above Garage, adding 3 bedrooms totalling roughly 800 sf (one master bedroom w/ closet on first floor Burrillville Town$50,000
May 4, 2026Building PermitReplace structural beam in basement due settling in existing framing.Replacing drop-beam with 4-ply 14.25" x 12' LVL, 2- 4" Steel posts with 24"x24" concrete foProvidence City$6,000
Dec 11, 2025Building Permit—South Kingstown Town—
Dec 11, 2025Building Permit—South Kingstown Town—
Jul 11, 2025Building Permit-Relocating gas/ electric meters, -Pouring new 20X30 slab on footing w? 7' x 40' porch slab. -Framing new 1200 sf 2 story addition (1st floor in-law/ 2nd floor North Providence Town$120,000
Jun 10, 2025Building PermitRemodleing Kitchen (roughly 150sf) Removeing existing cabinets and tile floor, Installing- new cabinets new countertop new tile floor and backsplash throughout Providence City$50,001

Permit status

Where its permits stand, as the departments report them.

  • Active11
  • Completed7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.