Contractor · General building
Garrett Evans
18 building permits since 2018 in Providence city, RI; Warren town, RI and Narragansett town, RI, across 4 counties — $412,262 in reported job value over 13 permits that state one.
- Building permits
- 18
- Reported job value
- $412.3K
- Active
- 2018–2026
- Latest permit
- Sep 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI4
- Warren town, RI2
- Narragansett town, RI2
- South Kingstown town, RI2
- Barrington town, RI1
- Bristol town, RI1
- Middletown town, RI1
- Newport city, RI1
- Burrillville town, RI1
- North Providence town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 1 |
| 2025 | 4 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms4
- Windows & doors4
- Kitchens3
- Roofing3
- Additions3
- Plumbing3
- HVAC2
- Remodels2
- Demolition2
- Electrical2
Permit types
As the building departments classify them.
- Building Permit18
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 21, 2026 | Building Permit | Furnish and install structural renovations in accordance with Engineers stamped Drawing S1 issued for construction Sept 18, 2026 by McBrie, LLC Structural Desig | Warren Town | $46,261 |
| Aug 4, 2026 | Building Permit | — | North Kingstown Town | — |
| Jul 30, 2026 | Building Permit | Remove garage roof. Frame second and third story addition above Garage, adding 3 bedrooms totalling roughly 800 sf (one master bedroom w/ closet on first floor | Burrillville Town | $50,000 |
| May 4, 2026 | Building Permit | Replace structural beam in basement due settling in existing framing.Replacing drop-beam with 4-ply 14.25" x 12' LVL, 2- 4" Steel posts with 24"x24" concrete fo | Providence City | $6,000 |
| Dec 11, 2025 | Building Permit | — | South Kingstown Town | — |
| Dec 11, 2025 | Building Permit | — | South Kingstown Town | — |
| Jul 11, 2025 | Building Permit | -Relocating gas/ electric meters, -Pouring new 20X30 slab on footing w? 7' x 40' porch slab. -Framing new 1200 sf 2 story addition (1st floor in-law/ 2nd floor | North Providence Town | $120,000 |
| Jun 10, 2025 | Building Permit | Remodleing Kitchen (roughly 150sf) Removeing existing cabinets and tile floor, Installing- new cabinets new countertop new tile floor and backsplash throughout | Providence City | $50,001 |
Permit status
Where its permits stand, as the departments report them.
- Active11
- Completed7
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.