Contractor · Demolition & excavation
Erin Krutz
18 building permits since 2020 in Bellevue city, WA.
- Building permits
- 18
- Reported job value
- —
- Active
- 2020–2024
- Latest permit
- Jun 24, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bellevue city, WA18
Permits by year
By issue date (application date where there is none).
07.515
13
202020212024
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 2 |
| 2021 | 3 |
| 2024 | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Demolition2
- Additions1
- Plumbing1
- Electrical1
Permit types
As the building departments classify them.
- TK9
- LY5
- UB2
- GD1
- UE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 24, 2024 | TK | Post Revision # 1: PSE will use the one-lane flagging during the night of 9/15 from 12am-4am to reframe/raise OH power lines spanning I-405 from LWB SE. FLJV is | Bellevue City | — |
| Jun 4, 2024 | UB | FLJV will install storm drainage along SE 8th St. between the I-405 on/off ramps per the attached site plan A. This work is related to right of way permit 24 10 | Bellevue City | — |
| Jun 4, 2024 | UB | FLJV will remove and replace the existing type 2 48" catch basin shown as DR31-5 or callout A74. | Bellevue City | — |
| Apr 26, 2024 | TK | Setup traffic control at the intersection of Lake Washington Blvd SE & 113th Pl SE to complete the installation of conduits to provide a new power service to SU | Bellevue City | — |
| Apr 24, 2024 | TK | FLJV will access the work site within WSDOT ROW from 119th Ave SE for fish passage 10 and CABS 10 construction. The construction of permanent access to maintain | Bellevue City | — |
| Apr 23, 2024 | LY | Valley Electric will complete the installation of conduits related to new power services SUA876. This will occur only during the nights of 4/17 and 4/18. | Bellevue City | — |
| Apr 12, 2024 | TK | FLJV will bore a conduit for SUA921B related to WSDOT illumination, implementing the attached traffic control plan. | Bellevue City | — |
| Apr 4, 2024 | LY | FLJV will implement a full weekend closure of the SB I-405 off ramp to Coal Creek Pkwy to complete the installation of a force main and pave the SB 405 off ramp | Bellevue City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued10
- Closed4
- Cancelled4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.