Contractor · HVAC
Elvis Lemes
18 building permits since 2020 in Marlborough city, MA; Needham town, MA and Franklin Town city, MA, across 6 counties — $558,105 in reported job value over 16 permits that state one.
- Building permits
- 18
- Reported job value
- $558.1K
- Active
- 2020–2026
- Latest permit
- Jun 1, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marlborough city, MA5
- Needham town, MA3
- Franklin Town city, MA2
- Andover town, MA1
- Monson town, MA1
- Hudson town, MA1
- Natick town, MA1
- Somerville city, MA1
- Plymouth town, MA1
- Fitchburg city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2022 | 3 |
| 2023 | 5 |
| 2024 | 3 |
| 2025 | 4 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC17
- Gas3
- Heat pumps1
Permit types
As the building departments classify them.
- Mechanical Permit3
- Mechanical Permit - Residential3
- Sheet Metal Permit - Residential & Commercial Projects3
- Franklin Sheet Metal Permit2
- Mechanical Permit - Commercial2
- Sheet Metal Permit2
- Building Permit - Sheet Metal1
- Mechanical and Sheet Metal Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 1, 2026 | Mechanical Permit - Residential | First Floor Install (1) - 97% AFUE GR9S96 Gas Furnace, R-32, Nine Speed ECM, Single Stage, Upflow/Vertical 80,000 BTU, Install (1) CHPTA3630B3 3T HZ CASED E COI | Marlborough City | $18,200 |
| Feb 10, 2026 | Mechanical Permit - Commercial | Install (1)3MXT24AVJU93 Port AURORA Multi OD 24k S/N E000374 Install (1) FTXV18AVJU9 FTXV18AVJU9 S/N Y057144 Install (1) CTXV07AVJU9 R-32HP AURORA DCTLESS ID 1/ | Marlborough City | $9,150 |
| Aug 26, 2025 | Mechanical Permit | New | Monson Town | $15,000 |
| Jun 27, 2025 | Mechanical Permit - Residential | Replace a Gas Furnance. *** SUBJECT TO FIELD VERIFICATION. *** | Marlborough City | $6,000 |
| May 5, 2025 | Mechanical Permit | Other | Southborough Town | $14,000 |
| Apr 10, 2025 | Mechanical Permit | install 1 Gás Furnace 60k Btu 96% Goodman Ac 2ton condenser Goodman | Andover Town | $14,000 |
| Dec 17, 2024 | Sheet Metal Permit - Residential & Commercial Projects | 2nd Floor, Master Bedroom and Attic. 3 - Zone system 1 - Install a 288BNV036000 EVOLUTION 3T HP VAR 1 - Install a fe4bnbc36l00 FAN COIL MOD 2 PIECE TX 3 - Insta | Needham Town | $38,120 |
| Jun 26, 2024 | Mechanical Permit - Commercial | Install 1 zone system in the basement. Install all Ductwork shown in the drawings. Install all RGDs. | Marlborough City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active5
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.