Contractor · General building

bryant, richard m

18 building permits since 2011 in Falmouth town, MA.

Building permits
18
Reported job value
—
Active
2011–2021
Latest permit
Jul 23, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA18

Permits by year

By issue date (application date where there is none).

01.53
3
2014201620182021
View as table
YearPermits
20112
20142
20153
20163
20172
20181
20202
20213

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors5
  • Roofing4
  • Electrical4
  • HVAC3
  • Remodels3
  • Bathrooms3
  • Plumbing3
  • Demolition3
  • Kitchens1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • RESI.12
  • REP3
  • COMM.2
  • CEP1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 23, 2021RESI.remove existing ''juliette'' balcony at rear of garage building & replace with 12' x 20' deck. wind borne debris: n/a for deckFalmouth Town—
Feb 18, 2021RESI.residential rebuild new 4 bedroom, 4 bath, with 2 decks and 1 porch.Falmouth Town—
Jan 22, 2021RESI.install new residentail elevator to include hvac, electrical and adjacent finishes.Falmouth Town—
Nov 10, 2020RESI.construct a new open 12 x 21 open sided pavilion *extension approved on 9/27/21 for 180 days only.*Falmouth Town—
Feb 3, 2020RESI.adding partition walls to unfinished basement area. work to be done around furnace room and add 2 closets w/ framing on outside walls. insulation, plumbing, eleFalmouth Town—
Mar 21, 2018RESI.demolition and replacement of existing pool decking, replacement of existing substructure, replace joist framing to accept new perimeter fencing. new fence to bFalmouth Town—
Dec 28, 2017CEPsiding of house using 4.5 squares white cedar, strip and re roof 10 squares, firestone rubberguard historical 17-78Falmouth Town—
Jan 24, 2017REPcape cod five install 2 replacement doors with no header changes.Falmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed17
  • Withdrawn1