Contractor · General building
STANCE LLC
19 building permits since 2018 in Santa Cruz County, CA.
- Building permits
- 19
- Reported job value
- —
- Active
- 2018–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA19
Permits by year
By issue date (application date where there is none).
02.55
5
2019202120242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 4 |
| 2020 | 2 |
| 2021 | 1 |
| 2023 | 3 |
| 2024 | 1 |
| 2025 | 5 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms4
- Pools & hot tubs4
- Plumbing2
- Windows & doors2
- Solar1
- Battery storage1
- Grading & excavation1
- Kitchens1
- Remodels1
- Roofing1
Permit types
As the building departments classify them.
- Building19
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Building | **OWNER TO ADDRESS VOIDED PERMITS B-184792, B-184793 and B-236639. NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZED.** Const | Santa Cruz County | — |
| Jan 7, 2026 | Building | Permit extension #1 B-261033 to B-244427 until 7/6/26. TG | Santa Cruz County | — |
| Sep 24, 2025 | Building | Extension #3 granted to permit B-173590 to 3/27/2026. | Santa Cruz County | — |
| Sep 17, 2025 | Building | Extension #2 granted to permit B-184792 to 3/16/2026. | Santa Cruz County | — |
| Aug 28, 2025 | Building | Extension #2 to B-184793 granted to 02/21/20206 | Santa Cruz County | — |
| Aug 14, 2025 | Building | **OWNER TO ADDRESS VOIDED PERMIT B-184793 . NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZED AND CLEARED.** DIS221254 Constr | Santa Cruz County | — |
| Apr 16, 2025 | Building | Replace existing subdrains, add a lined trench drain at building perimeter, new catch basin and sump pump at existing SFD. Verify and/or install listed smoke an | Santa Cruz County | — |
| Aug 8, 2024 | Building | Install a roof mount (2.49)kW, (6) modules photovoltaic electrical system not to exceed 32 feet in height and a (27)kWh, (2) battery energy storage system on SF | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Active4
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.