Contractor · Electrical
RICHARD L ROMANIELLO
19 building permits since 2018 in Greenwich town, CT and Norwalk town, CT — $52,000 in reported job value over 4 permits that state one.
- Building permits
- 19
- Reported job value
- $52K
- Active
- 2018–2026
- Latest permit
- Aug 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT18
- Norwalk town, CT1
Permits by year
By issue date (application date where there is none).
036
6
201820222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2022 | 3 |
| 2023 | 6 |
| 2024 | 4 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical18
- Electric meters3
- Gas2
- Bathrooms2
- Pools & hot tubs2
- HVAC1
- Additions1
- Plumbing1
- Generators1
- Water heaters1
Permit types
As the building departments classify them.
- ELE15
- EL22
- Ele No Fee1
- GEN1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 12, 2026 | ELE | install lighting and power outlet for garage only, no security, IT FA nor pool. Main house is separate permit. 11 swtchs., 21 outlets, 26 fixtures (56 total dev | Greenwich Town | — |
| Jun 9, 2026 | ELE | Install lighting and power outlets per Drawings 2/7/25. Does not include fire alarm, security or IT (all by others); 80 swtchs., 110 outlets, 100 fixtures (290 | Greenwich Town | — |
| Feb 4, 2026 | ELE | electrical lighting and outlets for new bath and laundry on 2nd flr.; wiring for new 3 ton hvac system (gas heat) and hot water heater. existing 200 amp. un ele | Greenwich Town | — |
| Aug 21, 2025 | ELE | Install lighting and power outlets per buiding permit drawings; no security work. Line voltage: 3 devices. 20 swtchs., 20 outlets, 50 fixtures (90 total devices | Greenwich Town | — |
| Jan 8, 2025 | EL2 | install 100 amp. temp. service (overhead). CRS: 19718879 | Greenwich Town | $2,000 |
| Aug 14, 2024 | ELE | Wire (1) spa (furnished by owner) with (2) separate circuits (20A, 240V, GFI) and (30A, 240,GFI) for pump and heater. 2 outlets (2 total devices) | Greenwich Town | — |
| Jun 5, 2024 | ELE | power and lighting outlets per Drawings; does not include fire alarm work IT work nor security. 15 swtchs., 39 outlets, 40 fixtures. | Greenwich Town | — |
| Jun 5, 2024 | ELE | Power and lighting outlets per drawings supplied with building permit. Does NOT include: fire-alarm work, security or IT work. 11 swtchs., 25 outlets, 28 fixtur | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed11
- Active6
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.