Contractor · Electrical
SOUTH WEST SOLAR INC
2,259 building permits since 2015 in Los Angeles city, CA; Norwalk city, CA and Oceanside city, CA, across 16 counties — $1,182,771 in reported job value over 100 permits that state one.
- Building permits
- 2,259
- Reported job value
- $1.2M
- Active
- 2015–2026
- Latest permit
- Sep 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA1.9K
- Norwalk city, CA151
- Oceanside city, CA40
- Riverside city, CA36
- San Diego County, CA27
- Camarillo city, CA18
- Vista city, CA11
- Madera city, CA8
- Marin County, CA7
- Temecula city, CA6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 101 |
| 2016 | 284 |
| 2017 | 239 |
| 2018 | 148 |
| 2019 | 139 |
| 2020 | 400 |
| 2021 | 684 |
| 2022 | 137 |
| 2023 | 61 |
| 2024 | 26 |
| 2025 | 8 |
| 2026 (YTD) | 32 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical2K
- Solar547
- Roofing106
- Additions59
- Battery storage22
- Electric meters10
- HVAC6
- Plumbing5
- Accessory dwelling units1
- Kitchens1
Permit types
As the building departments classify them.
- Electrical1.9K
- Solar Panel59
- BRES36
- BLD SOLAR PV RES33
- Solar Panel - Residential & PC32
- Residential Electrical30
- Electrical Residential solar panel27
- Bldg-Alter/Repair15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 14, 2026 | Residential SolarAPP+ Solar Permit | System type: Rooftop-mounted solar energy system Solar modules: 21 × Q.PEAK DUO BLK ML-G10.C+ 410 W Microinverters: 21 × Enphase IQ8HC-72-M-DOM-US, 240 V Batter | Artesia City | $43,000 |
| Aug 24, 2026 | Electrical Permit 2026 | 125 AMP SUB PANEL | Lakewood City | — |
| Aug 19, 2026 | Solar Residential Rooftop Permit | Removal and Re-installation of an existing rooftop Solar, ONLY. | Cypress City | $1,000 |
| May 19, 2026 | Arvin Building Permit | Removal and Reinstallation of an existing rooftop Solar ONLY. | Arvin City | — |
| Mar 26, 2026 | SolarAPP+ Solar Permit | Rooftop Mounted Solar Energy System PV+ST 9 Q.PEAK DUO BLK ML-G10.C+ 410 solar modules 9 IQ8HC-72-M-DOM-US {240V} microinverters 1 IQBATTERY-5P-1P-NA {240V} ESS | Cypress City | $20,000 |
| Mar 12, 2026 | Electrical | Eplan) pv1 for installation of roof mounted solar panels. Pv system includes 7 modules with 7 microinverters and 1 combiner box connected to existing main servi | Los Angeles City | — |
| Mar 10, 2026 | Roofing | Removal and reinstall for solar | San Bernardino County | — |
| Mar 4, 2026 | BLD- Permit - Photovoltaic System (Residential) | Removal and Reinstallation of an existing roof-mounted PV system size 5.720W DC, (22) modules during a re-roof project. Separate permit is required for re-roof | Murrieta City | $1,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated1.9K
- Finaled169
- Completed134
- Issued20
- Active17
- Expired11
- Cancelled3
- Withdrawn2
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- SOUTH WEST SUN SOLAR INC
- SOUTHWEST SUN SOLAR
- SOUTHWEST SUN SOLAR INC
- SOUTHWEST SOLAR
- SOUTHWEST SOLAR INC
- SOUTH WEST SUN SOLAR
- SOUTH WEST SOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.