Contractor · Electrical
Randy Fifield
19 building permits since 2018 in Coventry town, RI; Scituate town, RI and Smithfield town, RI, across 6 counties — $166,000 in reported job value over 17 permits that state one.
- Building permits
- 19
- Reported job value
- $166K
- Active
- 2018–2025
- Latest permit
- May 5, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Coventry town, RI3
- Scituate town, RI2
- Smithfield town, RI2
- Enfield town, CT1
- Griswold town, CT1
- Stonington town, CT1
- Douglas town, MA1
- Dudley town, MA1
- Sutton town, MA1
- East Greenwich town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 1 |
| 2021 | 4 |
| 2022 | 6 |
| 2023 | 3 |
| 2024 | 2 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical19
- Generators13
- Electric meters3
- Gas1
- HVAC1
- Remodels1
- Additions1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Electrical Permit15
- 2) Electrical Permit1
- EG Electrical Permit1
- Stonington Generator Permit1
- Wiring Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 5, 2025 | Electrical Permit | Supply and install a 20KW Kohler standby generator with a 200AMP ATS. Service already has surge protector, new grounds, and service disconnect existing. Generat | Smithfield Town | $11,000 |
| Nov 22, 2024 | Electrical Permit | — | Douglas Town | $11,000 |
| Apr 9, 2024 | Electrical Permit | Supply and install a 14KW Kohler standby with a 200AMP ATS. Generator is 18" off the back of the house and ats in basement near electrical panel. | Griswold Town | $10,000 |
| Oct 24, 2023 | Electrical Permit | Other | Dudley Town | $8,000 |
| Sep 28, 2023 | Electrical Permit | Supply and install a 20KW Kohler standby and 16circuit ATS in basement. | Burrillville Town | $9,000 |
| Jan 25, 2023 | Electrical Permit | Supply and install a 20KW Kohler standby generator near the electric meter socket. | Coventry Town | $10,000 |
| Nov 21, 2022 | EG Electrical Permit | Supply and install a 20KW Kohler standby generator and 200AMP ATS By the meter socket. | East Greenwich Town | $11,000 |
| Sep 21, 2022 | Electrical Permit | Install a 20KW Kohler standby generator with a 200AMP ATS in the garage. | Scituate Town | $10,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.