Contractor · Electrical
Pro-Energy Electric, LLC
19 building permits since 2005 in Mesa city, AZ and Phoenix city, AZ — $301,339 in reported job value over 13 permits that state one.
- Building permits
- 19
- Reported job value
- $301.3K
- Active
- 2005–2024
- Latest permit
- Jul 24, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ18
- Phoenix city, AZ1
Permits by year
By issue date (application date where there is none).
02.55
5
20062014201920222024
View as tableHide table
| Year | Permits |
|---|---|
| 2005 | 1 |
| 2006 | 1 |
| 2008 | 1 |
| 2014 | 1 |
| 2015 | 2 |
| 2019 | 1 |
| 2020 | 1 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical18
- Electric meters6
- EV chargers5
- Remodels2
Permit types
As the building departments classify them.
- Electrical12
- Res (OTH) -- Electrical3
- BLSC1
- Com (OTH) -- Renovations/Remodels1
- RES1
- Tenant Improvement (Interior Only)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 24, 2024 | Electrical | a. “Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. | Mesa | — |
| Jul 24, 2024 | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO | Mesa | — |
| Mar 19, 2024 | Electrical | INSTALLATION OF ONE (1) WALLBOX PULSAR PLUS LEVEL 2 HARDWIRED EV CHARGER. INSTALL NEW DEDICATED 60 AMP 240 VOLT CIRCUIT APPROX. 50FT FROM EXISTING 200A MAIN PAN | Mesa | $1,425 |
| Mar 4, 2024 | Electrical | Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requiremen | Mesa | $5,975 |
| Feb 22, 2024 | Electrical | Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requiremen | Mesa | $4,250 |
| Dec 8, 2023 | Electrical | RESIDENTIAL SINGLE FAMILY HOME ADDING A 100 AMP CIRCUIT ON MAIN PANEL FOR A NEW FORD CHARGE STATION PRO ONLY. THIS WORK WILL BE INSTALLED IN THE GARAGE FOR THE | Mesa | $1,900 |
| Jul 31, 2023 | Electrical | “Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. D | Mesa | $7,950 |
| May 2, 2023 | Electrical | Installation of Dedicated 100 amp Circuit for Ford EV Charger | Mesa | $1,650 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued11
- Finaled3
- Issued2
- Completed1
- Pending payment1
- Additional information required1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.