Contractor · HVAC
Paul Trayner Accurate Baker Elman
19 building permits since 2022 in Franklin Town city, MA; Sharon town, MA and Needham town, MA, across 3 counties — $378,000 in reported job value over 19 permits that state one.
- Building permits
- 19
- Reported job value
- $378K
- Active
- 2022–2025
- Latest permit
- Mar 13, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Franklin Town city, MA8
- Sharon town, MA4
- Needham town, MA3
- Natick town, MA1
- Dedham town, MA1
- Walpole town, MA1
- Douglas town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 10 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC18
- Heat pumps12
- Remodels4
- Pools & hot tubs4
- Gas1
- Plumbing1
Permit types
As the building departments classify them.
- Franklin Sheet Metal Permit8
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)4
- Sheet Metal Permit - Residential & Commercial Projects3
- Building Permit - Sheet Metal1
- Mechanical Permit1
- Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family)1
- Sheet Metal Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 13, 2025 | Sheet Metal Permit - Residential & Commercial Projects | Basement and 1st floor: modify existing ductwork from existing HVAC system to rooms that are currently not conditioned, install new linesets 2nd and 3rd floor: | Needham Town | $25,000 |
| Feb 18, 2025 | Franklin Sheet Metal Permit | Remove existing gas, forced hot air central heating system and install new gas furnace, heatpump and coil | Franklin Town City | $22,000 |
| Feb 9, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Remove existing furnace, coil and condenser and install new furnace, coil, condenser plus 5" filter box. | Sharon Town | $14,000 |
| Jan 21, 2025 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | Attic: • Remove and dispose existing coil and condenser • Install heat pump pad and level • Install Bosch Variable Speed Heat Pump (BOVD-36HDN1-M20G) • Install | Sharon Town | $30,000 |
| Jan 10, 2025 | Mechanical Permit | — | Douglas Town | $28,000 |
| Dec 10, 2024 | Franklin Sheet Metal Permit | Basement: • Remove and dispose existing furnace • Install Trane 2-Stage Furnace (S8X2B080M4PSCA) • Connect to exiting thermostat • Connect to existing venting • | Franklin Town City | $8,000 |
| Jul 1, 2024 | Sheet Metal Permit - Residential & Commercial Projects | Attic: • Remove and dispose existing equipment • Install Bosch 2-Stage 20 SEER Variable Speed Heat Pump (BOVB-36HDN1-M20G) • Install Bosch Hydronic Air Handler | Needham Town | $30,000 |
| Jun 24, 2024 | Sheet Metal Permit | Remove and dispose of existing HVAC systems in attic and in basement. Install new heat pump systems in attic and basement: Mitsubishi Hyper Heat Pump (SUZ-KA36N | Dedham Town | $33,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.