Contractor · General building

GILMAR COSTA

261 building permits since 2017 in Boston city, MA; Marlborough city, MA and Somerville city, MA, across 11 counties — $11,019,371 in reported job value over 232 permits that state one.

Building permits
261
Reported job value
$11M
Active
2017–2026
Latest permit
Oct 7, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA49
  • Marlborough city, MA27
  • Somerville city, MA13
  • Quincy city, MA11
  • Concord town, MA9
  • Grafton town, MA9
  • Andover town, MA8
  • Everett city, MA8
  • Lexington town, MA8
  • Walpole town, MA8

Permits by year

By issue date (application date where there is none).

02550
50
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20173
20185
201911
202018
202128
202230
202344
202438
202550
2026 (YTD)34

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels78
  • Bathrooms65
  • Demolition46
  • Windows & doors41
  • Kitchens38
  • Plumbing38
  • Electrical36
  • Roofing31
  • Additions17
  • HVAC12

Permit types

As the building departments classify them.

  • Building Permit43
  • INTREN26
  • Building Permit - Residential 1 & 2 Family22
  • RESI.19
  • Building Permit Application18
  • Building Permit - Residential10
  • Residential Building Permit8
  • Building Permit-All One and Two Family7

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 7, 2026Building PermitAdding a new bathroom in unfinished area REMODELING 2 STORAGES AND HALL IN THE UNFINISHED BASEMENT (work previously started without a permit)Grafton Town$69,312
Sep 25, 2026Building Permit - Residential 1 & 2 FamilyReplace vinyl siding for hardie plank, remove the garage door, and frame 2x6 wall and insulated with r-30 close cell, cover the entrance with a small shed roof.Marlborough City$18,500
Sep 25, 2026EXTRENEXTRENBoston City$62,442
Sep 23, 2026Demolition Permit - CompleteDemo interior walls, flooring, drywall, electrical and plumbing. **CSL HOLDER TO BE PRESENT DURING ALL INSPECTIONS** **PLUMBING/ELECTRICAL PERMITS REQUIRED** **Marlborough City—
Sep 22, 2026Building Permit - OTC CommercialRemove all existing asphalt shingles, rubber roofing and chimney flashing. Replace rotted wood as needed. Install 6ft of ice shield layer, install new aluminum Marlborough City$13,400
Sep 21, 2026Building Permit - OTC ResidentialRemove existing asphalt shingles. replace plywood as needed. Install 6 ft of ice and water shield at all eaves and 3 ft at all gable edges. Install vinyl roof lMarlborough City$10,500
Sep 9, 2026Building Permit - Residential 1 & 2 FamilyRemove existing Shingle roof. Inspect all plywood and replace if need. Install ice shield over the entire roof. Install new asphalt shingle. Install all new driMarlborough City$9,840
Aug 27, 2026—Remodel 2 full baths, remodel 1 half bath, Kitchen, flooring, remove mold, paint, replace 22 windows, replace 1 sliding door, replace smoke detector, electricalSomerville City$71,000

Permit status

Where its permits stand, as the departments report them.

  • Completed98
  • Active83
  • Closed38
  • Issued12
  • Stop work ordered10
  • Finaled6
  • Not stated5
  • Expired2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.