Contractor · General building
LOTUS PLUMBING COMPANY
19 building permits since 2013 in Tigard city, OR; Marion County, OR and Forest Grove city, OR, across 5 counties — $224,000 in reported job value over 13 permits that state one.
- Building permits
- 19
- Reported job value
- $224K
- Active
- 2013–2026
- Latest permit
- Nov 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tigard city, OR6
- Marion County, OR3
- Forest Grove city, OR2
- Lincoln City city, OR2
- Manzanita city, OR2
- Cornelius city, OR1
- Eugene city, OR1
- Keizer city, OR1
- Mount Angel city, OR1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2015 | 1 |
| 2021 | 3 |
| 2022 | 5 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 6 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing19
- Bathrooms8
- Remodels7
- Kitchens3
- Accessory dwelling units1
Permit types
As the building departments classify them.
- Commercial Plumbing9
- Residential Plumbing5
- Residential Plumbing - Additional Fixtures Being Added3
- Plumbing1
- Residential Plumbing - No Additional Fixtures or Sewer Connection1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 4, 2026 | Commercial Plumbing | PHO POT Relocate a hand sink, install hub drain primer, ice maker and rinse sink. | Forest Grove | — |
| Sep 15, 2025 | Residential Plumbing | 1 SNK, 1 TUB/S, 1 WC FOR Existing bathroom remodel | Mount Angel City | — |
| Sep 15, 2025 | Residential Plumbing | 1 SNK, 1 TUB/S, 1 WC FOR Existing bathroom remodel | Marion County | — |
| Sep 9, 2025 | Residential Plumbing - No Additional Fixtures or Sewer Connection | water service 40 feet | Tigard | — |
| Aug 19, 2025 | Residential Plumbing | bathroom remodel | Manzanita City | $5,000 |
| Aug 18, 2025 | Residential Plumbing - Additional Fixtures Being Added | Interior plumbing for new bathroom in basement: (1) sump pump, (1) sink, (1) shower, and (1) water closet. WATER METER UPGRADE TO 1" REQUIRED PRIOR TO FINAL INS | Tigard | — |
| Aug 7, 2025 | Commercial Plumbing | Interior Plumbing: Adding (1) 2" floor sink and (1) sink; Relocating (1) sink; Installing (1) primer. | Tigard | — |
| Aug 20, 2024 | Commercial Plumbing | Commercial Kitchen ADU Restroom | Lincoln City City | $39,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled9
- Expired6
- Closed2
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.