Contractor · General building
john r timmins
19 building permits since 2013 in Milton town, MA — $542,620 in reported job value over 18 permits that state one.
- Building permits
- 19
- Reported job value
- $542.6K
- Active
- 2013–2026
- Latest permit
- Jan 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Milton town, MA19
Permits by year
By issue date (application date where there is none).
024
4
20142017201920212026*
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2014 | 3 |
| 2015 | 2 |
| 2017 | 1 |
| 2018 | 4 |
| 2019 | 2 |
| 2020 | 2 |
| 2021 | 2 |
| 2022 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels9
- Bathrooms9
- Kitchens6
- Windows & doors4
- Additions3
- Plumbing3
- Demolition2
- Pools & hot tubs1
Permit types
As the building departments classify them.
- RESI.19
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 22, 2026 | RESI. | remove existing 14' x 10' deck and stairs. replace with smaller 10' x 8' deck with stairs. | Milton Town | $8,900 |
| Apr 25, 2022 | RESI. | convert existing enclosed frame porch into conditioned living space, per attached floor plan and section. existing jalousie windows to be replaced. new floor fr | Milton Town | $19,310 |
| Aug 16, 2021 | RESI. | remodel existing master bathroom (9' x 6'). strip out existing shower, toilet, vanity and jacuzzi tub. replace with new toilet, vanity, and walk-in tiled shower | Milton Town | $22,100 |
| May 14, 2021 | RESI. | remodel existing basement bathroom. (9'x7'). strip out existing shower, toilet and vanity. replace with new toilet, vanity and walk-in tiled shower. firestop an | Milton Town | $22,100 |
| Oct 29, 2020 | RESI. | kitchen and half bath remodel per plan. | Milton Town | $87,725 |
| Jul 30, 2020 | RESI. | rebuild garage which was destroyed by tree in a recent storm. garage will be rebuilt on existing foundation according to attached drawings. | Milton Town | $33,450 |
| Dec 17, 2019 | RESI. | remodel existing master bathroom. | Milton Town | $26,520 |
| Apr 10, 2019 | RESI. | remodel existing bath and build new bath, per plan. | Milton Town | $44,600 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.