Contractor · General building
GREY DUCK LLC
19 building permits since 2017 in Minneapolis city, MN — $581,500 in reported job value over 19 permits that state one.
- Building permits
- 19
- Reported job value
- $581.5K
- Active
- 2017–2021
- Latest permit
- Mar 4, 2021
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN19
Permits by year
By issue date (application date where there is none).
048
7
20172018201920202021
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 5 |
| 2018 | 7 |
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels13
- Bathrooms12
- HVAC11
- Plumbing9
- Electrical9
- Windows & doors5
- Kitchens4
- Grading & excavation2
- Additions1
- Demolition1
Permit types
As the building departments classify them.
- Res17
- Commercial2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 4, 2021 | Res | BATHROOM REMODEL. REMOVE AND REPLACE FIXTURES. REPLACE MAIN LEVEL CEILING WITH NEW GYP. NO STRUCTURAL WORK. (JJL) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, | Minneapolis City | $20,000 |
| Feb 23, 2021 | Res | BASEMENT REMODEL. ADDING BATHROOM AND SHOWER, LAUDNRY ROOM, OFFICE AND REC ROOM. NO STRUCTURAL WORK. CONFIRM CEILING HEIGHT IS 6'4" MIN. NO BEDROOMS. (JJL) SEPA | Minneapolis City | $28,000 |
| Aug 18, 2020 | Res | DORMER ADDITION Engineer: Phillips #20182 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. A SOIL EROSION | Minneapolis City | $80,000 |
| May 5, 2020 | Res | remodel 2nd floor kitchen. sck SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. THIS WORK MUST BE COMPLETE | Minneapolis City | $25,000 |
| Mar 3, 2020 | Res | NON-STRUCTURAL MAIN FLOOR BATHROOM REMODEL AT SFD, REPLACE WC & LAV IN EXISTING LOCATIONS, EXISTING TUB TO REMAIN. REPLACE EXISITNG WINDOW WITH NEW WINDOW (SAFT | Minneapolis City | $7,500 |
| Nov 26, 2019 | Res | BASEMENT REMODEL. WILL USE SUSPENDED CEILING. NO STRUCTURAL WORK. FURING OUT SOME WALLS AND USING SPRAY FOAM OR RIGID INSULATION. GUT AND RE-DO BATHROOM. FRAMIN | Minneapolis City | $25,000 |
| Apr 29, 2019 | Res | remodel kitchen and add full bath on first floor. enclose back entryway and add small entry deck/steps. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, | Minneapolis City | $55,000 |
| Oct 10, 2018 | Res | FRONT STOOP REPLACEMENT. REMOVE EXISTING STOOP. ADD NEW CMU WALL BELOW GRADE WITH 10" PIERS AT CORNER. WILL USE EXISTING STOOP FOOTING IF ADEQUATE WHEN UNCOVERE | Minneapolis City | $2,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.