Contractor · General building
Emmett Little
19 building permits since 2018 in Newport city, RI; Little Compton town, RI and Middletown town, RI — $2,420,694 in reported job value over 19 permits that state one.
- Building permits
- 19
- Reported job value
- $2.4M
- Active
- 2018–2026
- Latest permit
- May 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Newport city, RI7
- Little Compton town, RI5
- Middletown town, RI3
- Portsmouth town, RI2
- Tiverton town, RI2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 4 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 2 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Additions4
- Windows & doors4
- Roofing3
- Demolition3
- Remodels2
- Bathrooms2
- Battery storage1
- Grading & excavation1
- Kitchens1
Permit types
As the building departments classify them.
- Building Permit18
- Demolition Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 12, 2026 | Building Permit | This is an addition to our currently permitted scope of work. The addition to our scope is to extend the existing deck as illustrated in the attached drawings. | Portsmouth Town | $24,000 |
| Feb 17, 2026 | Building Permit | Renovation of existing residence as illustrated in attached drawings. Structural Engineering is pending for the two new large windows units on the North side of | Portsmouth Town | $650,000 |
| Nov 13, 2025 | Demolition Permit | Demolition and disposal of existing wood frame garage. Foundation to remain. | Tiverton Town | $1,700 |
| Mar 10, 2025 | Building Permit | Replace existing decking and railings. Install new Pergola and staircase per construction documents. | Little Compton Town | $53,190 |
| Oct 16, 2024 | Building Permit | Demolition of existing interior, deck, windows and siding. Interior and exterior renovation per Construction Documents. Replace existing deck and lay new paver | Little Compton Town | $534,429 |
| May 1, 2024 | Building Permit | Remove existing roof and second floor system. Construct new Second Floor, Belevedere, and roof decks per Construction Documents attached. | Little Compton Town | $350,000 |
| Jun 2, 2023 | Building Permit | Installation of twelve replacement windows in existing residence | Newport City | $12,200 |
| Dec 19, 2022 | Building Permit | 1. Demolition of Existing Kitchen Addition 2. Lift existing building off of foundation (straight up) 3. Remove existing fieldstone foundation 4.Excavate for new | Little Compton Town | $267,375 |
Permit status
Where its permits stand, as the departments report them.
- Active14
- Completed4
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.