Contractor · Plumbing
Michael Cambio
264 building permits since 2012 in South Kingstown town, RI; Narragansett town, RI and Warwick city, RI, across 6 counties — $1,110,415 in reported job value over 117 permits that state one.
- Building permits
- 264
- Reported job value
- $1.1M
- Active
- 2012–2026
- Latest permit
- Aug 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- South Kingstown town, RI45
- Narragansett town, RI39
- Warwick city, RI37
- North Kingstown town, RI32
- Providence city, RI21
- New Shoreham town, RI21
- Cranston city, RI10
- Barrington town, RI8
- Pawtucket city, RI8
- Cumberland town, RI6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 2 |
| 2017 | 9 |
| 2018 | 18 |
| 2019 | 42 |
| 2020 | 29 |
| 2021 | 40 |
| 2022 | 30 |
| 2023 | 35 |
| 2024 | 29 |
| 2025 | 17 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing179
- HVAC108
- Bathrooms48
- Gas30
- Kitchens30
- Water heaters12
- Remodels5
- Additions4
- Heat pumps4
- Generators3
Permit types
As the building departments classify them.
- Plumbing Permit141
- Mechanical Permit99
- 4) Plumbing Permit6
- EG Mechanical Permit5
- 3) Mechanical Permit4
- Building Permit4
- PLUMB.3
- GAS2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 11, 2026 | Mechanical Permit | Install approximately 50' of direct burial gas pipe with 2 anodeless risers to outside generator | Smithfield Town | $3,600 |
| Aug 11, 2026 | Plumbing Permit | Pull and reset toilet and vanity in downstairs bath. Install rough and finish plumbing for barsink in basement | Smithfield Town | $3,525 |
| Aug 7, 2026 | Plumbing Permit | Install underground, rough and finish plumbing for 1 sink, 1 vanity sink, 1 toilet | Cumberland Town | $8,800 |
| Jul 1, 2026 | Plumbing Permit | — | Westerly Town | — |
| Jun 18, 2026 | Plumbing Permit | — | Narragansett Town | — |
| Jun 16, 2026 | Plumbing Permit | Install rough and finish plumbing for 5 units. To include roll in showers, toilets, lav sinks, and kichen sinks.Units 1-A, 1-B, 1-C, 1-E, 1-F | Pawtucket City | $105,000 |
| May 12, 2026 | Mechanical Permit | Remove existing steam boiler and indirect hot water storage tank and replace with new equiptment. 100k btu Weil Mclain and a Heat-Flo 40 | Providence City | $20,250 |
| May 12, 2026 | Plumbing Permit | Install rough and finish plumbing to kitchen sink, Install rough and finish plumbing to vanity, toilet and shower, replace sink in basement | Providence City | $11,900 |
Permit status
Where its permits stand, as the departments report them.
- Completed205
- Active55
- Stop work ordered3
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.