Contractor · General building
D.B.C. Solutions
19 building permits since 2022 in Thompson town, CT; Putnam town, CT and Woodstock town, CT — $605,228 in reported job value over 19 permits that state one.
- Building permits
- 19
- Reported job value
- $605.2K
- Active
- 2022–2026
- Latest permit
- Nov 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Thompson town, CT7
- Putnam town, CT4
- Woodstock town, CT4
- Pomfret town, CT2
- Brooklyn town, CT1
- Plainfield town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 6 |
| 2025 | 4 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels10
- Windows & doors7
- Kitchens6
- Plumbing6
- Bathrooms5
- HVAC4
- Electrical4
- Roofing2
- Additions1
Permit types
As the building departments classify them.
- Building19
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 2, 2026 | Building | Interior kitchen remodel, no structural changes. Repair ice dam damaged ceiling (insulation, drywall). Remove upper cabinet and range hood; install new hood/blo | Pomfret Town | $68,000 |
| Oct 29, 2026 | Building | rebuilding exterior of rear dormer. Includes replacing existing sliding door with new window, replacing all siding, replacing soffit and facia boards, and repla | Woodstock Town | $36,200 |
| Sep 11, 2026 | Building | Patch a small area of water damaged sheetrock, install new trim in one room and one closet, install new LVP flooring in the same two spaces and paint everything | Putnam Town | $16,500 |
| Aug 27, 2026 | Building | Kitchen remodel: remove existing cabinets, countertops, flooring, appliances and portions of exterior wall; modify plumbing and electrical; upgrade service to 2 | Thompson Town | $115,000 |
| May 26, 2026 | Building | minor kitchen remodel, replacing some cabinets and adding a few more, new countertops and tile backsplash, new sink and faucet, updated lighting, fresh paint. | Putnam Town | $27,000 |
| Apr 27, 2026 | Building | Bathroom remodel, remove and replace the flooring, vanity, shower, toilet, plumbing and lighting fixtures. Also update electrical devices and water shutoffs. PL | Thompson Town | $17,000 |
| Sep 20, 2025 | Building | Kitchen remodel~1) removing part of the wall (weight bearing) between the kitchen and living area. 2) Installing 3 new cabinets w/countertop in place of removed | Thompson Town | $19,188 |
| Jul 23, 2025 | Building | Exterior renovation of two out buildings. remove and replace all siding, soffits & facias, and roofing. Also replacing the garage doors with new (2-9' x 7'). al | Thompson Town | $28,875 |
Permit status
Where its permits stand, as the departments report them.
- Closed8
- Approved6
- Finaled3
- New1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.