Contractor · Electrical
BAKER HOME ENERGY
19 building permits since 2023 in Riverside County, CA; Chula Vista city, CA and Oceanside city, CA, across 3 counties.
- Building permits
- 19
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- Mar 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside County, CA9
- Chula Vista city, CA5
- Oceanside city, CA2
- Anaheim city, CA1
- Fullerton city, CA1
- Orange city, CA1
Permits by year
By issue date (application date where there is none).
01020
16
202320252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Solar8
- Battery storage6
- Roofing3
- HVAC1
- Heat pumps1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical13
- HVAC1
- Residential – Building – Re-Roofing1
- Roofing1
- SFD ROOFING1
- SFD SOLAR PV - PANEL UPGRADE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 30, 2026 | Residential – Building – Re-Roofing | 24 SQS OF ASPHALT SHINGLES (TIMBERLIINE HDZ) - MULTICOLOR 3.6 SQS OF COOL ROOF CAP SHEET (JM) - WHITE TEAR OFF EXISTING ROOF TO SHEATHING USE EXISTING SHEATHING | Fullerton City | — |
| Mar 12, 2026 | Electrical | Bel2600592 (1) lunar battery le-ess-20kwh, 20kwh | Riverside County | — |
| Mar 6, 2026 | Electrical | Pv+st 33 rec410aa pure-r solar modules 2 1707000-xx-y {240v, 11.5kw} inverters 2 1707000-xx-y {11.5kw} ess system size: 13.53 kw dc (23.02 kw ac) | Riverside County | — |
| Mar 4, 2026 | Roofing | Re-roof dwelling, 1600sqft lift and lay tile | Riverside County | — |
| Mar 3, 2026 | Electrical | Pv+st 21 q.peak duo blk ml-g10.c+ 410 solar modules 1 l2-ess-20kwh inverter 1 le-ess-20kwh ess system size: 8.61 kw dc (9.6 kw ac) | Riverside County | — |
| Mar 3, 2026 | Electrical | S47986 srreola pv+st 15 q.tron blk m-g2.h+ 430 solar modules 1 1707000-xx-y {240v, 11.5kw} inverter 1 1707000-xx-y {11.5kw} ess system size: 6.45 kw dc (11.51 k | Chula Vista City | — |
| Mar 2, 2026 | Electrical | 7.31kw pv system with 11.5kw/13.5kwh energy storage - (17) solar panels, (1) powerwall 3 battery, tesla backup switch | Orange City | — |
| Mar 2, 2026 | Electrical | Energy storage system - 2 tesla ac powerwall 3. 10kw. 1 back up switch (bxx2500048) | Riverside County | — |
Permit status
Where its permits stand, as the departments report them.
- Active9
- Finaled8
- Not stated1
- Completed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.