Contractor · Electrical

BAKER HOME ENERGY

19 building permits since 2023 in Riverside County, CA; Chula Vista city, CA and Oceanside city, CA, across 3 counties.

Building permits
19
Reported job value
—
Active
2023–2026
Latest permit
Mar 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside County, CA9
  • Chula Vista city, CA5
  • Oceanside city, CA2
  • Anaheim city, CA1
  • Fullerton city, CA1
  • Orange city, CA1

Permits by year

By issue date (application date where there is none).

01020
16
202320252026*
* 2026 is year to date.
View as table
YearPermits
20232
20251
2026 (YTD)16

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Solar8
  • Battery storage6
  • Roofing3
  • HVAC1
  • Heat pumps1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical13
  • HVAC1
  • Residential – Building – Re-Roofing1
  • Roofing1
  • SFD ROOFING1
  • SFD SOLAR PV - PANEL UPGRADE1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2026Residential – Building – Re-Roofing24 SQS OF ASPHALT SHINGLES (TIMBERLIINE HDZ) - MULTICOLOR 3.6 SQS OF COOL ROOF CAP SHEET (JM) - WHITE TEAR OFF EXISTING ROOF TO SHEATHING USE EXISTING SHEATHINGFullerton City—
Mar 12, 2026ElectricalBel2600592 (1) lunar battery le-ess-20kwh, 20kwhRiverside County—
Mar 6, 2026ElectricalPv+st 33 rec410aa pure-r solar modules 2 1707000-xx-y {240v, 11.5kw} inverters 2 1707000-xx-y {11.5kw} ess system size: 13.53 kw dc (23.02 kw ac)Riverside County—
Mar 4, 2026RoofingRe-roof dwelling, 1600sqft lift and lay tileRiverside County—
Mar 3, 2026ElectricalPv+st 21 q.peak duo blk ml-g10.c+ 410 solar modules 1 l2-ess-20kwh inverter 1 le-ess-20kwh ess system size: 8.61 kw dc (9.6 kw ac)Riverside County—
Mar 3, 2026ElectricalS47986 srreola pv+st 15 q.tron blk m-g2.h+ 430 solar modules 1 1707000-xx-y {240v, 11.5kw} inverter 1 1707000-xx-y {11.5kw} ess system size: 6.45 kw dc (11.51 kChula Vista City—
Mar 2, 2026Electrical7.31kw pv system with 11.5kw/13.5kwh energy storage - (17) solar panels, (1) powerwall 3 battery, tesla backup switchOrange City—
Mar 2, 2026ElectricalEnergy storage system - 2 tesla ac powerwall 3. 10kw. 1 back up switch (bxx2500048)Riverside County—

Permit status

Where its permits stand, as the departments report them.

  • Active9
  • Finaled8
  • Not stated1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.