Contractor · General building

1ST CHOICE PLUMBING & BACKFLOW PREVENTION LLC

19 building permits since 2021 in Howard County, MD.

Building permits
19
Reported job value
—
Active
2021–2026
Latest permit
Jun 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD19

Permits by year

By issue date (application date where there is none).

036
6
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20213
20224
20236
20242
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing19
  • Remodels14
  • Additions14
  • Bathrooms7
  • Water heaters6
  • Gas5
  • HVAC4
  • Kitchens4
  • Electrical2
  • Generators1

Permit types

As the building departments classify them.

  • Residential Plumbing Addition Alteration Permit11
  • Express Plumbing Permit4
  • Commercial Plumbing Addition Alteration Permit3
  • Residential New Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 25, 2026Express Plumbing PermitFront water line repair on exterior of the home.Howard County—
Dec 29, 2025Residential Plumbing Addition Alteration PermitSFD/master and hall bath remodel - Master bath: 1-Tub, 1-Double vanity, 1-Water closet. Hall: 1-Shower, 1-Water closet, and 1-VanityHoward County—
Jul 8, 2025Express Plumbing PermitRepair the leaking water main in front of the home with new polyethylene.Howard County—
Mar 31, 2025Commercial Plumbing Addition Alteration PermitUnit 102/ Replace 1-washer box and 1 electric water heater; 1-electric furnace, test existing drains and water piping onsite to ensure functionality, 2-water clHoward County—
May 22, 2024Residential Plumbing Addition Alteration PermitSFTH/Installation of new saniflo water closet and vanity in basement - one Saniflo ejector pump water closet and vanity. Vanity drain to be tied into saniflo.Howard County—
May 20, 2024Commercial Plumbing Addition Alteration PermitInstall Backflow on site, Zurn Wilkins 1" 975XL RP INSTALLED REAR OF BUILDING FOR IRRIGATIONHoward County—
Dec 29, 2023Express Plumbing PermitFront Yard Exterior Sewer RepairHoward County—
Aug 2, 2023Residential Plumbing Addition Alteration PermitRough in water and above grade drain for full bath in basement and bar sink with pump system, ground work is existing INSTALL 1-Water closet, 1-Shower with SchlHoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Cancelled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

1ST CHOICE PLUMBING & BACKFLOW PREVENTION LLC — Building Permits & Contractor Profile | Buildstats