Contractor · General building
1ST CHOICE PLUMBING & BACKFLOW PREVENTION LLC
19 building permits since 2021 in Howard County, MD.
- Building permits
- 19
- Reported job value
- —
- Active
- 2021–2026
- Latest permit
- Jun 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD19
Permits by year
By issue date (application date where there is none).
036
6
202120222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 3 |
| 2022 | 4 |
| 2023 | 6 |
| 2024 | 2 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing19
- Remodels14
- Additions14
- Bathrooms7
- Water heaters6
- Gas5
- HVAC4
- Kitchens4
- Electrical2
- Generators1
Permit types
As the building departments classify them.
- Residential Plumbing Addition Alteration Permit11
- Express Plumbing Permit4
- Commercial Plumbing Addition Alteration Permit3
- Residential New Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 25, 2026 | Express Plumbing Permit | Front water line repair on exterior of the home. | Howard County | — |
| Dec 29, 2025 | Residential Plumbing Addition Alteration Permit | SFD/master and hall bath remodel - Master bath: 1-Tub, 1-Double vanity, 1-Water closet. Hall: 1-Shower, 1-Water closet, and 1-Vanity | Howard County | — |
| Jul 8, 2025 | Express Plumbing Permit | Repair the leaking water main in front of the home with new polyethylene. | Howard County | — |
| Mar 31, 2025 | Commercial Plumbing Addition Alteration Permit | Unit 102/ Replace 1-washer box and 1 electric water heater; 1-electric furnace, test existing drains and water piping onsite to ensure functionality, 2-water cl | Howard County | — |
| May 22, 2024 | Residential Plumbing Addition Alteration Permit | SFTH/Installation of new saniflo water closet and vanity in basement - one Saniflo ejector pump water closet and vanity. Vanity drain to be tied into saniflo. | Howard County | — |
| May 20, 2024 | Commercial Plumbing Addition Alteration Permit | Install Backflow on site, Zurn Wilkins 1" 975XL RP INSTALLED REAR OF BUILDING FOR IRRIGATION | Howard County | — |
| Dec 29, 2023 | Express Plumbing Permit | Front Yard Exterior Sewer Repair | Howard County | — |
| Aug 2, 2023 | Residential Plumbing Addition Alteration Permit | Rough in water and above grade drain for full bath in basement and bar sink with pump system, ground work is existing INSTALL 1-Water closet, 1-Shower with Schl | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Cancelled2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.