Contractor · Electrical

ZAHED AL RUBAYE

20 building permits since 2023 in Bristol town, CT; Rocky Hill town, CT and Stamford town, CT, across 5 counties — $50,750 in reported job value over 16 permits that state one.

Building permits
20
Reported job value
$50.8K
Active
2023–2026
Latest permit
Sep 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bristol town, CT5
  • Rocky Hill town, CT4
  • Stamford town, CT3
  • New Milford town, CT2
  • Enfield town, CT1
  • Winchester town, CT1
  • Norwich town, CT1
  • Stonington town, CT1
  • Darien town, CT1
  • New Fairfield town, CT1

Permits by year

By issue date (application date where there is none).

048
8
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20232
20243
20257
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical20
  • Kitchens3
  • Bathrooms2
  • Plumbing2
  • Windows & doors2
  • Water heaters2
  • Remodels1
  • Additions1
  • Electric meters1
  • Fire sprinklers1

Permit types

As the building departments classify them.

  • Electrical Permit18
  • Electrical Permit Application1
  • Stonington Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 24, 2026Electrical PermitElectrical works for coffee store , include new outlets for the machines & equipement kitchen Area , new store light fixtures , water heater , ADA restrooms , nStamford Town$15,000
Aug 18, 2026Electrical Permitinstall 400A main disconnect , move panel of church , outdoor electrical work , install outside flood light , repair some electrical wiring in general . move paBristol Town$2,500
Jul 29, 2026Electrical Permitchange 2x4 light fixture to LED light , upgrade 2 EXIT sign to Combo type , install 3 window outlet , register counter outlet .New Milford Town$4,000
Jun 23, 2026Electrical Permit Applicationrelocate the smoke detector 3ft away from the vent , replace outelt to GFCI in basement , replace the reccessed light breakers to ARC FAULT breakers .New Fairfield Town$1,000
Jun 9, 2026Electrical Permitupgarde the service from 100A to 200A single phase , new meter socket with main disconnectWinchester Town$3,500
Jun 1, 2026Electrical PermitRenovation of bathroom , with new wiring to the light /fan & switch with GFCI outletBristol Town$450
Apr 17, 2026Electrical PermitElectrical works for 8ft HOOD , New counter register , arrange electrical wiring for the Panel , wiring for 2 coolers & store lightStamford Town$4,500
Mar 2, 2026Electrical PermitElectrical wiring for tenant include , store light upgrade , Exit sign , Emergency light installed , 12 ft HOOD electrical wiring , Kithcen Area GFCI outlet , DDarien Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Active5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.