Contractor · Electrical

Vision Infrastructure Development Inc.

20 building permits since 2022 in Brunswick County, NC — $17,902,838 in reported job value over 14 permits that state one.

Building permits
20
Reported job value
$17.9M
Active
2022–2026
Latest permit
Aug 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brunswick County, NC20

Permits by year

By issue date (application date where there is none).

0510
9
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20224
20232
20243
20259
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical1

Permit types

As the building departments classify them.

  • FIRE PERMIT14
  • BUILDING1
  • BUILDING (MINIMUM)1
  • FIRE HYDRANT FLOW TEST - PER NFPA 291 TEST1
  • GATE AND BARRICADE ACROSS FIRE APPARATUS1
  • PRIOR POWER RELEASE1
  • PRIVATE FIRE HYDRANTS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 6, 2026FIRE HYDRANT FLOW TEST - PER NFPA 291 TESTPerform Fire Hydrant Flow TestBrunswick County—
Aug 6, 2026PRIVATE FIRE HYDRANTSPrivate Fire Hydrant Install- coordinate with field inspector on rough-ins, etcBrunswick County—
Apr 28, 2025FIRE PERMITFire Final- Foundation OnlyBrunswick County$1,791,222
Apr 28, 2025FIRE PERMITFire FinalBrunswick County$1,037,663
Apr 28, 2025FIRE PERMITFire Final- Foundation OnlyBrunswick County$1,552,936
Feb 26, 2025FIRE PERMITFire FinalBrunswick County$1,552,492
Jan 16, 2025FIRE PERMITFire Final- Foundation OnlyBrunswick County$1,048,300
Jan 13, 2025FIRE PERMITFire Final- FOUNDATION ONLYBrunswick County$1,552,936

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.