Contractor · Electrical
tesla energy oeprations
20 building permits since 2022 in 2501519370, MA.
- Building permits
- 20
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Feb 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- 2501519370, MA20
Permits by year
By issue date (application date where there is none).
0510
10
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 5 |
| 2024 | 10 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar16
- Roofing16
- Electrical12
- Battery storage6
Permit types
As the building departments classify them.
- ELECT.11
- RESI.9
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 18, 2026 | ELECT. | temporarily remove and reinstall 2 existing solar panels so that homeowner can have another contractor is raise the roof . re do the dc piping to the roof at re | Easthampton Town City | — |
| Nov 28, 2025 | ELECT. | temporarily remove and reinstall existing solar panels for roof work. no changes to existing system. | Easthampton Town City | — |
| Apr 17, 2025 | RESI. | install 2 energy storage battery units (27 kwh total) in attached garage with bollards | Easthampton Town City | — |
| Mar 17, 2025 | ELECT. | install 2 energy storage units (27 kwh total) in attached garage sidewall with bollards | Easthampton Town City | — |
| Nov 13, 2024 | RESI. | installation of 2 energy storage battery units ( 27 kwh total) in attached garage sidewall with bollards | Easthampton Town City | — |
| Oct 22, 2024 | ELECT. | install 2 energy storage battery units (27 kwh total) in attached garage | Easthampton Town City | — |
| Apr 23, 2024 | RESI. | remove existing solar and reinstall after a third party completes roof work | Easthampton Town City | — |
| Apr 18, 2024 | ELECT. | remove existing solar panels and reinstall without layout change after third party completes roof work | Easthampton Town City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed11
- Issued8
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.