Contractor · Specialty (solar, fire, telecom)

NOVA SOLAR INC

269 building permits since 2018 in Arlington County, VA; Howard County, MD and Henrico County, VA, across 19 counties — $3,851,901 in reported job value over 166 permits that state one.

Building permits
269
Reported job value
$3.9M
Active
2018–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA71
  • Howard County, MD59
  • Henrico County, VA39
  • Chesterfield County, VA38
  • Anne Arundel County, MD15
  • St. Mary's County, MD8
  • Rockville city, MD7
  • Richmond city, VA7
  • Albemarle County, VA4
  • Manassas Park city, VA4

Permits by year

By issue date (application date where there is none).

050100
85
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20182
20197
202015
202116
202224
202323
202442
202585
2026 (YTD)55

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar228
  • Electrical112
  • Remodels90
  • Additions31
  • Roofing8
  • Generators3
  • Battery storage2
  • Electric meters1
  • New construction1

Permit types

As the building departments classify them.

  • Alteration48
  • Electrical42
  • Residential Electrical Addition Alteration Permit30
  • Solar Express (Residential Only)29
  • Residential Electrical23
  • Residential Building17
  • Residential Solar Permit15
  • Electrical Permit10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026AlterationInstallation of Roof Mounted 14.96kW Solar PV System.Arlington County—
Oct 22, 2026Solar Express (Residential Only)SFD/ Installation of a 25-module, 22.0kW ground-mounted solar PV system 25 PANELS**SUBJECT TO FIELD INSPECTION**Howard County$26,488
Oct 21, 2026ElectricalElectrical related to the installation of a 20-module, 8.8kW roof mounted solar (PV) systemArlington County—
Oct 20, 2026Residential Electrical Addition Alteration PermitElectrical associated with a 25-module, 22.0kw ground-mounted solar pv systemHoward County—
Oct 14, 2026Residential BuildingInstallation of a 43-module solar panels, 18.92kW roof-mounted solar PV system.Chesterfield County$26,488
Oct 14, 2026Residential ElectricalInstallation of wiring for a 43-module solar panels, 18.92kW roof-mounted solar PV system.Chesterfield County$6,622
Oct 8, 2026ElectricalElectrical related to the installation of a 67-module, 29.48kW roof mounted solar (PV) systemArlington County—
Oct 7, 2026AlterationInstallation of a 20-module, 8.8kW roof mounted solar (PV) systemArlington County$14,800

Permit status

Where its permits stand, as the departments report them.

  • Completed80
  • Finaled71
  • Issued67
  • Closed30
  • Not stated5
  • Expired4
  • Pending4
  • Approved2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.