Contractor · Demolition & excavation
QUALITY CONTRACTORS
20 building permits since 2015 in Asheville city, NC — $38,900 in reported job value over 4 permits that state one.
- Building permits
- 20
- Reported job value
- $38.9K
- Active
- 2015–2019
- Latest permit
- Oct 23, 2019
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Asheville city, NC20
Permits by year
By issue date (application date where there is none).
036
6
20152016201720182019
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 4 |
| 2016 | 2 |
| 2017 | 6 |
| 2018 | 3 |
| 2019 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation16
- Roofing1
Permit types
As the building departments classify them.
- Res: Site Work15
- Com: Repair-Replacement1
- Com: Site Work1
- Res: Accessory Structure1
- Res: Other1
- Res: Reroof1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 23, 2019 | Res: Site Work | REMOVE AND REPLACE EXISTING CONCRETE DRIVEWAY WITH SAME SPECIFICATIONS FOR LAURI AND JOHN ARNOLD | Asheville | — |
| Oct 4, 2019 | Com: Repair-Replacement | REPLACE BACK EXISTING SIDEWALK REMOVED FOR REPAIRS. SIDEWALK REMOVED BY OTHERS, LINE REPAIRS/RAIN REPAIRS, PRIVATE SIDEWALK SYSTEM. DISTURBING 280 SQ FT. WILL B | Asheville | $9,000 |
| May 23, 2019 | Res: Site Work | RESIDENTIAL GRADING FOR ADDING CONCRETE OVER EXISTING GRAVEL FOR NEW PARKING PAD FOR CAMERON LANE, NO APRON WORK | Asheville | — |
| Feb 14, 2019 | Res: Site Work | PREP FOR DRIVEWAY, SIDEWALK AND TURN AROUND AREA MAY ALSO BE USED AS PATIO AND FILLING IN EXISTING SHED FLOOR ALL WILL BE DONE IN CONCRETE FOR RON JONES. | Asheville | — |
| Jan 2, 2019 | Res: Site Work | REMOVE EXISITNG DRIVEWAY AND REPLACE BACK WITH NEW SAME LOCATION FOR MICHAEL BASHAW | Asheville | — |
| Jul 31, 2018 | Res: Other | REMOVE AND REPLACE DRIVEWAY APRON, REMOVE AND REINSTALL CITY SIDEWALK, AND REMOVE AND INSTALL NEW PARKING PAD FOR ERIC RHOTON | Asheville | $15,000 |
| Jul 25, 2018 | Res: Site Work | REMOVE AND REPLACE DRIVEWAY APRON, REMOVE AND REINSTALL CITY SIDEWALK, AND REMOVE AND INSTALL NEW PARKING PAD FOR ERIC RHOTON | Asheville | — |
| Jun 8, 2018 | Res: Site Work | PREP DRIVEWAY FOR NEW DRIVEWAY APRON. NO CHANGE TO THE APRON LOCATION FOR DAVID STANLEY | Asheville | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled7
- Expired5
- Closed4
- Issued4
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.